What is "P" in CCPQ?
Parameter
True or False: FPQ DMS is not a RTT DMS?
False
True or False: Data Integrity Principles must be followed across the whole data Lifecyle
True
A parameter that, when not met, renders the product unsaleable and/or unusable. Typically, HS&R, claim support, and P&G policy issues will be classified this way.
10
Multiple choice: Automated Detection Systems help ensure product ___
A.Availability
B.Quality
C. Safety
B. Quality
ALCOA+: Clear identification to the person acquiring/generating the data (who –when)
Attributable
CCQP is documented on QEC, what is "E" in QEC
Evolution
Fill in the blank:
Quality risks are identified and mitigated ____ production begins
Before
ALCOA+: Record the action, result measurement or data at the time the work is performed
Contemporaneous
Critical FMOT, SMOT related parameters. Typically, these are related to performance defects that would likely prompt consumers to take action such as filing a compliant or choosing not to purchase/repurchase the product/package.
8
What is FPQ DMS Output Measure?
Unplanned Hold
ALCOA+: Editing should be performed with documented reasons for the change and annotating the amendments
Accurate (Free from errors, truthful and reflective of the observation, Editing should be performed with documented reasons for the change and annotating the amendments)
Give 3 examples of DLP CCQP10
#1 Superior cleaning (Surfactant, Polymer, Enzymes, Brightener
#2 Regulation (Total active (surfactant, pH insoluble etc.)
#3 Right Suds generation and mileage based on consumer needs
#4 Smell clean with perfume (Spray-on SEA/PMC)
#5 Whites & Shining
#6 Enzyme safety
#7 Consistent Fill Level / Density
#8 Raw materials used meet safety requirements
#9 The right product and feature is in the right package
#10 Product Safety (no foreign material contamination)
#11 Fill volume
#12 Lot number should be clearly printed
#13 Product looks premium (Artwork, PM)
#14 Number of primary packages in the secondary package
Fill in the Blank:
Manufacturing processes are operated against the defined ______,
meaning Production in the validated state at all times
Standard
What is + (plus) on ALCOA+
Complete, Consistent, Enduring and Available