Quarry Deposit Evaluation & Mine Planning
Mine Planning
Load & Haul
Devil's Slide
Belt Conveyors
Crushing
Tom's Wild Card Column
100

What is the main and mostly costly step of an exploration?

Core drilling

100

Which NA plant has the most convoluted geology?

Hagerstown

100

A haul truck backs up to the Front End loader at a:

45 degree angle

100

How old is the Devil's Slide plant?

121 years

100

Material is pouring out of the rubber skirt seal between the belt and load point because:

Inner steel liner is most likely worn

100

What hazard could be present in the drilling dust when drilling abrasive rock?

Crystalline Silica

100

The warning on Tom's Truck says:

May stop suddenly for rocks

200

What are 2 broad categories for classifying & reporting our raw material tonnages?

Resources & Reserves

200

What is the Holcim tool to plan and schedule the extraction of blocks based on chemistry, quarry, mining directions?

QSO

200

Which 3 plants have to barge their rock to the plant?

Joppa, Theodore, Richmond

200

When you benchmark Devil's Slide to other plants, this plant is high in:

Raw Material Costs and Strip Ratio

200

For most raw material handling applications the best support option under a load zone is:

Impact Bed with rubberized idlers

200

To mine a uniform, single bench flat-lying deposit, the most appropriate crushing system is:

Mobile

200

The creek that runs past the plant is called?

Lost Creek

300

What is one of the most important reasons why we need a block model?

Fundamental basis for mine planning and strategic decisions.

300

What are the tasks of QSO?

Scheduling, Optimization, Blending, Planning, Reserve Reporting

300

Shift Efficiency is?

85%

300

Devil's Slide strip ratio is?

3 TO 1

300

A raw material belt of 250 m in the plant should not exceed a speed of?

2.0 m/s

300

What is the most cost-effective method to size reduction material?

Blasting

300

Devil's Slide is?

Limestone exposed by eroding softer sedimentary rock

400

What are 2 elements needed to build a geological model?

Topography and supreme knowledge of geology!

400

How long is each of the following? A long term plan, medium term plan & a short term plan?

Greater than 10 to LIfe of Mine years, 3 to 5 years. 12 months

400

A front end loader sized appropriately for the haul truck fleets loads scoops in:

30 to 40 seconds

400

The CAT model of Devil's Slide Haul trucks are:

CAT 777

400

The minimum recommended distance from the back de-dusting vent to end of the load point skirt board sealing is?

200mm

400

The most appropriate crusher to crush drv abrasive quartzite at 800 t/h is:

Gyratory Crusher

400

Who at Aggregates Industries developed the Highwall Safety Scorecard?

Eddy Bailey and Simon Collins

500

What are the 3 correct considerations when initiating a deposit investigation?

location, permitting & mining rights, chemistry

500

What are the deliverables of a long term mining plan?

Quarry Engineering & Design, Safe pit design, Production Plan,Reserves and Resources

500

What are 3 parts of the Highwall Safety Scorecard

Exposure to Hazard, Characteristics of Rock, Berm Distance

500

The bands Devil's Slide is currently using for limestone are:

New Devil's Slide and C Band

500

Describe the guarding requirements for a a new belt

Pull cord, guards at tail, pulley, return idlers, snubs, and any area where there is a sealing to the belt (load zone / skirting) - nip point

500

What is the most common crusher tvpe within Holcim?

Single shaft Horizontal Impact Crusher

500

Tell us the formula for the Bogue Equation (one component)

See Tom's Sheet