Functional Team -
Pt. 1
Functional Team -
Pt. 2
CCMT Team
PMO Team
Technical Team
100

The R3 Project Functional Team creates many specs. Name three. 

What are: functional specs, form specs, reports, automations, and BPMs?

100

Their are several modules in which the BSAs and BAs arrange their work around. Name three. 

What are: FASA, Billing, Curriculum and Academics, Community, Admissions? 

100

In MyAC, new Thesis SM/TSP terminology is shared through the _________ series. 

What is New Term Tuesday?

100

Risks, Actions, Issues, and Decisions are tracked in this log. 

What is the RAID log?

100

_________ is the platform used to support both International and AC Online student applications.

What is Salesforce?

200

Each Academic Term ______ Co-op Students join the Testing team.

What is 3?

200

________ is the name of the BSA who works on the Billing module. 

Who is Jess Trask?

200

The ________ connects with the CCMT team regularly throughout the Academic Year and helps to share important messages about the Project across all areas of the College.

What is the Change Champion Network (CCN)?

200

This Teams channel holds the 02.0 Onboarding Materials, which includes helpful processes documents and checklists. 

What is the General Channel?

200

This integration will result in all Learners (Domestic and International) making payments to the College in the same way. 

What is Flywire?

300

Name three permanent members of the R3 Project Testing Team.

Who are: [Name], [Name], [Name]?

300

The R3 Project Data Team has successfully completed _____ data migrations on schedule. 

What is 16?

300

Tasked-based training will provide the AC Community with 3 types of training materials. 1. Task Guides, 2. Video Tutorials, and 3. __________. 

What are Guided Simulations?

300

This committee is made up of members from 14 different departments at AC.

What is R3 Implementation Committee?

300

The __________ function will move from the SIS to Infosilem (our scheduling software). 

What is Course Loading?

400

The first data migration took place in March of _______. 

What is 2022?

400

There have been ______ bugs found and accepted for fixes by Thesis. 

What is 200+?

400

The ________ is a change management plan that will help guide learners and the employees who support them as we transition to using Thesis SM and the Thesis Student Portal.

What is the Learner Change Management Plan (LCMP)?

400

The R3 Project, which includes 38 employees and 30 contractors, has two of these, which are used to manage costs incurred by the Project. 

What are Cost Codes?

400

______ is the standard for an integration between a SIS and a LMS (Learning Management System)?

What is Learning Information Services (LIS)?