M&S essentials
Sales Process
The NEC and you
Perfect Ticket
In the field
100

On Time to M&S is 15 minutes early. What is the ideal arrival time to our first call?

7:45 AM

100

According to M&S, when is the best time to write a thank you card?

Immediately after call, in van

100

What is the minimum grounding electrode conductor size for a 200 amp service?

#6

100

What signatures are required during a service call?

Diagnostic, Invoice, Payment

100

Per manufacturer instructions, what size breakers are allowed when installing an Eaton CHSPT2ULTRA Surge Protector?

50A

200

M&S technicians are allowed to wear what color undershirt when in uniform?

White or Dark Blue

200

M&S uses the term good/better/best to describe what?

How your estimates should be structured/flow

200

Properly grounding a residential home limits what? High Power, High Voltage, High Current?

Voltage

200

What percentage of tickets are expected to have photos or videos added?

100%

200

Name 3 of the 5 situations we pull a permit.

Trench, home run, 240 circuits, panel/service, restore power

300

How often should you wash your truck/van?

Every time at the office, or as needed

300

What are the 4 questions we ask during the pre-call?

Name? Address? Reason for call? Place to park?

300

What is considered "working clearance" around a panel?

30" or panel wide, 6.5' or panel tall, 36" outward

300

What do you do if a customer doesn't answer the precall?

Arrive at home, knock, inform office, give customer opportunity to reply(30 minutes), leave door hanger. Bonus, add photo of home to ticket

300

What is the maximum distance between residential  receptacles?

12ft

400

Which direction should the M&S logo face when placed in front of a customer's door?

So the customer can read it clearly

400

Name two M&S approved examples of "giving the pickle"

Rolling in trash cans, cleaning gutters, picking up package

400

Explain 2020 GFCI requirement for kitchens

All receptacles serving kitchen countertops

400

We should provide at least ___ estimates

3 or more

400

Wire size needed for 7200W Oven?

10cu

500

How many canvas drop cloths should be stocked on your truck?

6

500

True or False, if a customer requests a change to an estimate after it has been approved, another signature is needed

TRUE

500

What is the minimum number of 20A circuits required in a dwelling?

Four. 2 small appliance, one laundry, one bathroom, garage if one exists

500

What are the three Wells Fargo Financing tiers?

12mo/no interest, 50mo/5.99%, 10yrs/9.99%

500

In one sentence, describe backstabbing and why is it not the best method?

Outlets with wires wrapped tightly around screws are less likely to have broken connections than wires stabbed into the back of the device

600

Describe the uniform footwear

Polishable and black

600

Give an example of an OPEN ended question that would help gather information from a customer

What are you doing when this happens?

600

What is article 230 in the NEC?

Services

600

List the waivers to get signed and when needed

Drywall, Landscape

600

What 3 common depths are required by code when installing trenched circuits?

UF - 24", Conduit - 18", 12" with GFCI protection and in conduit

700

How many uniforms are issued to each technician

13 shirts, 13 pants

700

When is the best time to handle an objection?

Before it is brought up by the customer/before the presentation by the technician

700

What circuit should be installed for this A/C unit?

#12Cu, wiring to support 20a, 30a circuit breaker

700

What is the best way to present an HCA with your estimates?

Include it in the pricing for your work

700

During a load calculation, general lighting load is ____ per square foot 

3W

800

What is our Mission Statement?

To exceed our customer's expectations and provide a memorable experience

800

When and what should you write on a thank you card?

Immediately after the call, make it personal (something you and the customer discussed unrelated to the work completed)
800

Equipment Ground Conductors of Size ____ and Larger shall be permitted to be identified with green tape at terminations

4 AWG; NEC 250.119(A)

800

What information can you see on ST mobile dashboard? 4 of the 8 metrics

Opps, Opp Job Avg $, Conversion Rate, Revenue, Leads set, Lead conv rate, Membership conv rate, Customer Satisfaction

800

Describe ground rod placement for a residential home

8ft in ground, at least 6ft of part, shortest distance from panel as possible