This clause has had the most mid-course corrections in the past 5 years.
What is the fuel clause?
This rate, implemented during the last rate case, is for our non-residential customers with billing demands over 1,000 kW at least once over the past 12 months.
Acceptable Responses:
What is GSLD and/or what is SBLD?
What is General Service Large Demand and/or what is Standby Large Demand?
Also: What is GSLDPR or GSLDSU or GSLDTPR or GSLDTSU?
The FPSC is the regulatory agency we work with most often.
What is the Florida Public Service Commission?
These regulatory team members work frequently with AMI Operations, Customer Experience and Meter Operations.
Who are Katy and Kim?
The Load Research department works with this data most frequently as required by the Florida Public Service Commission.
What is 15-minute interval meter data?
This assembled volume containing rules, regulations, and rate schedules is a contract between Tampa Electric and its customers.
What is Tampa Electric’s Tariff?
The FRCC is a Florida regulatory agency focused on whether utilities can consistently meet the demand for electricity while maintaining acceptable levels of safety and quality of service.
What is the Florida Reliability Coordinating Council?
The "Sheriff of the Tariff" is another common name for this individual.
Who is Lisa Grant.
This term is used to describe all items necessary for calculating a customer's bill.
What are billing determinants?
This annual FPSC filing requires Tampa Electric to report on its customers who own renewable generation systems.
What is the net metering and interconnection report?
Also acceptable: Either the phrase, "net metering" or "interconnection" "report" or "filing".
When a GS customer exceeds 9,000 kWh consumption in a given month, an obligatory switch to one of these two rate schedule occurs.
What are GSD or GSDO?
Also Acceptable:
What is General Service Demand?
What is General Service Demand Optional?
In the world of NERC Compliance, you may hear the acronym of PNC.
What is "Potential Non-Compliance"?
These Tallahassee attorneys are included in The Best Lawyers in America® 2024 edition.
Who are Malcolm Means and Jeffry Wahlen?
What are revenues?
This filing containing customer load statistics is submitted every three years to the Florida Public Service Commission.
What is the Load Research Report? And/or What is the Load Research Sample Plan?
This section of Tampa Electric's tariff that contains an index of rate schedules.
What is Section 6?
The ECRC, not to be confused with ECCR, is filed annually and refers to one of Tampa Electric's clauses.
What is the Environmental Cost Recovery Clause?
Double points if you know what ECCR stands for: Energy Conservation Cost Recovery
The regulatory compliance team reports to this Director.
Who is Jordan Williams?
This study allocates costs to the different rate classes and becomes the basis for the rates we charge.
What is the Cost of Service analysis?
These two Tampa Electric clauses are filed under the same docket number with the FPSC.
What is the:
1) FUEL & PURCHASED POWER COST RECOVERY and 2) CAPACITY COST RECOVERY Filings?
Also acceptable: What is the Fuel and Capacity filing?
The Minimum Distribution System concept classifies distribution costs into these two buckets.
What are Demand and Customer-related costs
The acronym that stands for the internet-based system to obtain electric power transmission services in North America.
What is OASIS?
Double Points if you know what is stands for:
Open Access Same-Time Information System
These team members ensure all filings are assigned to be completed and filed with the appropriate agency by their respective due dates.
Also acceptable:
Who is Paula Brown, Tison Vega, Brenda Irizarry, Kayla Cutting, Ty Nelson and Dashira Silvestre?
These tests, used to establish DSM [Demand-side Management] goals, allow the accomplishment of significant DSM development without placing undue upward pressure on rates.
What is the RIM test? or Ratepayer Impact Measure (RIM) Test (previously the Non-Participant Test)?
Also acceptable:
What is the PCT test? or Participant Cost Test?