QUOTE REQUESTS
LEADTIMES
PO REQUIREMENTS
CHAFERS
CUSTOM TABLE EQUIPMENT
100

Who do you reach out to for a freight quote?

Customer Service

100

What is the lead time for a frost top?

4-6 weeks from receipt of PO and signed shop drawing

100

What are the 4 requirements for a table to enter production?

Formal PO

Color selections - stone and cabinetry

Deposit

Signed Drawings

100

Which chafer line does not ship with an insert?

- Sauteuse (Seasons)

100

What is the most popular edge style and why?

- Wood edge 

- Most durable edge style for mobile tables 

- Shops can cut the stone in house because it does not need to be polished 

200

What determines the discount for a quote request?

The Dealer. We need the first and last name of the dealer.

200

What is the lead time for ICS and ICB stations?

6-8 weeks from receipt of the PO, and laminate color confirmation

200

What two details are needed for the coordinators to order Smartstone?

Color and finish

200

Name all 3 chafer lines that have a glass viewing lid

- Radiance

- Reflections 

- Vision Seasons

200

What is the minimum distance required between any cutouts in Smartstone?

- 4"

300

What table styles do not work with frost tops?

QS7230

NESTING TABLE

HERITAGE TABLE

CURVED LEG

NAPER

(OTHERS CAN BE ENCLOSED)

300

What is the standard lead time for permanent Versa-Gard sneezeguards?

4-6 weeks from receipt of PO and signed drawings

300

Which of the following items require a deposit?

A. Frost Top

B. ICB234-18

C. Smartstone Slab

D. VG3-P-SP-60

C. Smartstone Slab

300

What two Spring USA chafer lines can use standard full size pans?

Full size Reflection 

Full size Rondo

300

What is the most cost effective built-in equipment option to keep food cold?

- Ice Pan

400

What are 2 things missing from the request below?

Please provide a quote on the continental table with 4 hidden ranges, a plate shelf, and casters for Ed Don. We need this ASAP!

Cabinet Material (stain or laminate)

Dimensions

Project Name 

Power - 120v or 220v

Countertop  Edge Style  

Ed Don Rep Name 

400

What is the lead time when a Smartstone color is out of stock?

12-16 weeks (50% Made in Italy!)

400

The following description is on your customers PO. Do we have everything we need to enter production?

(4) QSC6827 in Low Line laminate

No. The standard QSC6827 comes in a wood stain so this needs to be requoted and cannot come from stock.

400

Which chafer has a self-closing axle option?

Sauteuse (seasons)

*** have to specify self closing axle on PO

400

what does E0 mean on Spring USA induction ranges?

1) no vessel being detected

2) if there is a vessel, it could be not induction compatible 

3) if there is induction ready vessel but still have E0, then it's a fan related issue due to prior overheat 

500

What information can the coordinators use to find old custom orders and quotes?

Property Address, Project Name, PO Number

500

What can effect the lead time for a custom table? What variables are there?

It depends on the following:

- when deposit, signed drawings, and colors are received

- equipment availability/ lead times

- drop dead/ need by date

- labor schedule availability


500

What does "Ship by the customer" mean?

The customer schedules shipping via their own carrier and Spring USA does not handle logistics.

500

Which hotel brand has a customized red powder coated chafer? 

*** Double Jeopardy (Double or Nothing) if you can name the model number! 

Hampton Inn

2171-6BR

500

How many total amps can each of the below manage? 

- powerstrip

- power management

- 20 amps 

-50 amps