Asset Suite 9
Name that Station!
KPI Me Up Before You Go-Go
Governance Galore
OMG OPG!
(Acronymns)
100

This is the AS9 panel from which you can cancel a PM

What is the M300 or Work Order Completion panel?

100

Because of its rapid response time and dual-fuel capability, this station often supports Ontario’s grid when renewable sources like wind or solar are not available

What is Lennox GS?

100

These are the 5 measures that feed into WMPI.

What are LTO PM, Crit-2 PM, Crit-2 CR, Backlog and Schedule Variance Index?

100

 If a post-seismic or special surveillance check is required for dam safety, this is the work order type that shall be used (be specific!)

What is a non-credit PM?

100

eWP

What is Electronic Work Package?

200

To include a photo, specific instruction or reference material that is not an OPG controlled document in a work order package, a Planner should use this in AS9.

What is a Work Standard?

200

In 2018, this station was destroyed by a tornado?

What is Calabogie GS?

200

This is the # of ‘days grace’ that RG has to finish or cancel WOT before the reporting locks in.

What is 5 weekdays?

200

Prior to creating a new work request, this is the first step that an initiator should take.

What is determine if a WR already exists for the issue?

200

ORCP

What is Ontario Reliability Compliance Program?

300

When scheduling from the Schedule Workbench (WF-M210) WO backlog grid, performing this action will add schedule days to the WOT. If prior schedule dates exist on the task, they will not be removed.

What is Dispatch?

300

This is the oldest continuously operating hydroelectric station in the OPG fleet.

What is DeCew Falls?

300

The Schedule Variance Index evaluates how much unscheduled work disrupted the monthly schedule. To be considered unscheduled or “break-in” this field must be blank.

What is Schedule Start Date?

300

RG's work order task priority table (used to determine WOT priority codes) can be found in this procedure.

What is RG-PROC-MA-0002 Work Management - Assess, Plan and Schedule Work?

300

PMMR

What is Preventive Maintenance Modification Request?

400

Once a WO task is in Complete status, this is the number of days until it advances to Closed status

What is 90 Days?

400

This is one of 3 Northeast facilities currently undergoing redevelopment.

What are Stinson, Coniston or Matabitchuan?

400

LTO and Crit 2 PM compliance metrics use data from this BI report to evaluate compliance

What is Work Accomplishment?

400

If asked to create a new equipment tag, this is the governance a Planner should reference

RG-STD-MA-0002 Hydroelectric Equipment Asset Suite Nomenclature Standard

400

PEP

What is Program Execution Plan?

500

When implementing a PMMR to revise a PM, the PMMR ID# must be entered in this AS9 field for future reference.

What is AS9 D081 "Revision Comments"?

500

This Northwest dam is known for being one of the most remote sites in the province, accessible only by air or water.

What is Root River Control Dam?

(also acceptable: Lake St. Joseph Diversion Dam)

500

The Backlog Index Ratio compares the # of backlog tasks to the # of non-backlog tasks. This is the maximum ratio where teams will achieve 100%

What is 4:1 (backlog:non-backlog)?

500

This procedure defines the process for ensuring modifications to preventive maintenance predefines are reviewed and controlled to align with business imperatives.

RG-PROC-MA-0006 Preventive Maintenance Change Management

500

WGF

What is Water Gauge Failure?