Well Control
Abbreviations
Waste Management
Parker Facts
Drills
100

Variable bore rams shall be tested with the smallest and largest drill pipe to be used per _______ regulations.

What is AOGCC

100

WCBD

What is "Well Control Bridging Document"

100

The tag associated with this waste contains the Rig name, Date, Well #, the name of the individual packaging the waste, a description of the waste, and a phone number. 

What is Oily Waste

100

Consists of 21 land rigs and 1 barge rig

What is Parker's International Fleet

100

D1

What is kick while tripping

200

A common phenomenon when drilling on the north slope of Alaska, and can complicate recognition and response in well control operations.

What is well bore breathing

200

MASP

What is "Maximum Anticipated Surface Pressure"

200

_______ gloves are considered hazardous waste.

What is Leather

200

Consists of 13 barge rigs in GOM and 2 land rigs in Alaska

What is Parker's US fleet

200

D2

What is kick while drilling

300

A minimum of one ____ , held in the open position with appropriate crossovers and operating handle shall be available on the rig floor at all times

What is Full Open Safety Valve

300

SICP

What is "Shut in Casing Pressure"

300

Oily waste bags should not exceed ____ Pounds.

What is 30

300

Year that Parker Drilling was founded in Oklahoma by G.C. parker.

What is 1934

300

D3

What is a diverter drill

400

Posted at BOP panels, and gives directions on shutting in the well.

What are standing orders

400

MAWHP

What is "Maximum Anticipated Wellhead Pressure"

400

The SAA and RAA stations can be found in this area

What is the boiler room 

400

The year the company begins Alaska operations with contract from the U.S. Atomic Energy Commission to drill large diameter holes for nuclear testing.

What is 1968

400

D4

What is a accumulator drill

500

Has the overall responsibility for the well

Who is the BP WSL

500

OEM

What is "Original Equipment Manufacturer"

500

Oily waste bags containing free liquids, gravel, snow, aerosol cans, batteries, hazardous waste, or sharp containers will be _________.

What is rejected 

500

In 1981, Parker Drilling builds the world’s largest drilling rig, Parker 201, capable of drilling to _____ feet.

What is 50,000

500

D5

What is a well kill drill