How Risky do you feel?
Agile
Quality Techniques
Quality is always Better than Quantity
PMP 101
100

Name 3 negative risk responses?

What is Avoid, Mitigate and Transfer?

100

a meeting held after a release to gather lessons learned

What is retrospective?

100

This is a diagram that shows the causes of an event and is often used in manufacturing and product development to outline the different steps in a process, demonstrate where quality control issues might arise, and determine which resources are required at specific times.

What is an Ishikawa diagram?

100

This means having suppliers deliver resources just before they are needed

What is Just in Time?

100

a temporary and unique endeavor that aims to achieve specific objectives within a defined timeframe, budget, and scope

What is a project

200

Name 3 positive risk responses

What is Exploit Enhance Share

200

What ceremony is happening in this picture?

What is daily stand up?

200

In project management, the quality planning tool of setting up tests for a process is known as what?

What is “Design of Experiments.”

200

Continous improvement involves continuously looking for ways to improve the quality of work, processes and results. Name one of the three approaches

What is Kaizen/

Total Quality Mgmt/

Six Sigma

200

the possibility of something bad happening

What is risk

300

These risk remain after risk response planning

What is residual risk?

300

What is the meeting called after a project is over and you review the work from the sprint?

What is a demo?

300

This is a set of technical guidelines that may be applied during the design of a product for the optimization of a specific aspect of the design.

What is Design for X 

300

All are examples of cost of nonconformance except

Rework.                   Warranty Cost

Quality training.        Scrap

What is quality training?

300

 a prioritized list of work for the development team that is derived from the roadmap and its requirements.

what is product backlog

400

Having a back up plan in project management is often called a 

What is contingency plan?

400

This is an example of a 

what is a burn down chart?

400

One measures the time from the moment the customer makes a request to the time they receive something. The other measures the time it takes the development team to work on the request and deliver it.


what is a lead time and cycle time?

400

All the following are tools and techniques of Control Quality except:

Inspection    Cost of Quality 

Histogram.   Cause and Effect

What is cost of quality?

400

refers to a category or ranking system used to classify deliverables that fulfill the same functional quality but have different features

What is grade

500

An indicator that a risk is about to occur or has occurred. Triggers may be discovered during the risk identification process and monitored as the project is executed.

What is a risk trigger?

500

Name 3 main members of the agile team

What are 

Project Manager/ Scrum Master

Product Owner

Team


500

This is an example of a 


What is a check sheet?

500

This is when your team wants to do extra work that is un planned to impress the customer

what is goldplating?

500

What makes up the traditional Triangle of Constraints?

what are Scope, Time, and Cost