Risk Analysis (AdR)
Scenario
F0/F1
F2/F3
Capitalization
100

This is where to check suppliers IQB score

What is Microstrategy (MSY) or NC PowerBi

100

For a rubber compounding new source approval, when starting the scenario development, this document is always consulted

What is the ROG (Rules of the Game)

100

This is the criteria in the DOA supplier selection study which is required for F0

What is destructive criteria?

100
This is the milestone where V1 of the MDI file is required to be validated, if applicable industrial trials were run

What is F2 milestone?

100

This is where the quality and technical status are updated after F3 is passed.

What is DDM?

200

These milestones are required to have AdR filled out

What is F1, F2 & F3

200

These are the names of various industrial trials that could be run in an approval

What is MPI, MI & LI trials

200

This person approves the EHS VISA in NA (rubber compounding)

Who is Mike Shea (EP)

200

For a 1st source approval, this certificate is required before passing F2

What is an Homologation Certificate

200

This is where the FdV (Fiche de Vie) is currently stored to keep up to date records of important raw material info.

What is DocShare? (This will eventually move to Sharepoint, timing TBD)

300

Concerning the alignment of Michelin and supplier laboratories, these results are compared throughout the approval to ensure alignment in properties.

What are Michelin & COA (supplier results)?

300

For Rubber compounding, these codes are the quality & technical status options in DDM for products still under approval.

What is EL5, PI5 & MI5. 

300

The person(s) who sign the F1 flag

Who is 

1. RMD project leader, 

2. TCM, 

3. RMD quality function?

300

If an industrial trial was required in the scenario before F2, this trial would be called...

What is the MPI trial?

300

This is when the approval dossier is uploaded into PMU

What is after F3 passage?

400

This is the definition of an R1 risk

Risk on product performance from the design

400

These people "validate" the approval scenario

Who is 

1. RMD project owner

2. RM team (or designer, central indus for reinforcements)

400

The person(s) who sign the F0 flag

Who is 

1. Owner

2. Technical Category Manager or delegation

3. RMD quality function

400

In a new source approval not linked to MDIP (AP2B approval), this is being declared at the F2 milestone.

What is H/Q equivalence 

400

This person is responsible for RMD NA approval milestone tracking on the scorecard 

Who is Darrell Chandler?

500

This section was added to the Risk Analysis (AdR) and was not part of the old Approval dossier AdR

What is Sustainable risk section?

(B13 - Does the supplier have an environmental policy & B14 - Has the supplier committed to sharing its LCA data for the RM concerned)

500

For 1st source approvals (AP3 - raw material approval linked to MDIP project), this is passed at F2. Bonus points for answering what is passed at F3

F2 = What is homologation 

F3 = What is qualification

500

This is the document that is accepted in place of the external CdC for Mataux approvals.

What is the TDS (Technical data sheet)

500

These people sign the F3 flag for a new source approval

Who is 

1. RMD project leader

2. TCM or delegation

3. DCAQ/quality guarantor

4. Designer

5. Central industrializer

500

This is the project title of the AGM document uploaded into PMU

(Metal) What is 

AGM⌴[ZONE]⌴[MATREF] (Example AGM_NA_TA12345x01)

(Rubber & Textile) What is 

AGM⌴[ZONE]⌴[MATIND] (Example AGM_NA_PG12345AA)