100

A pre-treatment enzymatic spray use by clinicians to keep residual blood & debris moist prior to & during transport to SPS decontamination area

What is ProEZ enzymatic spray?

100

Loaner (borrowed) instrument trays must be received in the SPS decontamination area in a minimum _______ prior to use to have an adequate reprocessing time

What is 48 hrs.?

100

A person who is a liaison of SPS and end-users that have technical expertise of handling RME in the clinical setting

What is RME Champions?

100

Hinged instruments must be left in the _____ position to ensure sterilant can get to all crevices and nooks of the instrument

What is Open position?

100

The most important step in reprocessing reusable medical equipment

What is CLEANING?

200

An end-user responsibility to wiped off & flush lumens during the end of the procedure using sterile water to remove all gross debris

What is PRE-CLEANING

200

Vendor must provide manufacturer's _____ and inventory count sheets for loaner instrument trays.

What is Instructions for Use (IFU)?

200

Serve as a ______ point of contact for facility staff when addressing RME particular to that service line

What is Go To person?

200

A term use when soiled instruments were held in the exam or procedural room and not transported to the soiled utility room or designated holding area between EACH patient use

What is Batching?

200

It is antimicrobial reduction of microorganisms and at its highest level should be the removal of all or most of pathogenic microorganisms.

What is Disinfection?

300

Instruments that have blood, pus, & other secretions contain chloride ions can lead to _______ most often appearing as dark spots

What is Corrosion?

300

If loaner instrument trays arrive late in the medical facility, the use of ______ is not allowed

What is Immediate Use Steam Sterilization  (IUSS)?

300

Is to assist SPS when developing and/or maintaining _______ of RME

What is Inventory List?

300

It is the pick up time for critical and semi-critical RME in the facility and CBOC area

What is 4 hours & 12 hours?

300

Instruments that are not cleaned thoroughly cannot be ______ or ______. This is because the soil shields bacteria & viruses from the sterilizing medium

What is sterilize or disinfected?

400

How to don & doff PPE

What is Bottom up?

400

AAMI recommends that Loaner Instruments must undergo _______

What is Product Testing of sets?

400

An initial or ongoing assessment of knowledge, skills and ability of staff who handles and/or reprocess RME

What is COMPETENCY?

400

It is a Bloodborne Pathogens Standard (BBP) to wear when handling soiled RME

What is Personal Protective Equipment (PPE)?

400

If RME sterile storage door is propped, this will interfere the controlled environment ____air pressure

What is Positive air pressure?

500

It is in VHA Directive 1116 & DUSHOM memo regarding end-user responsibility of _________

What is pre-cleaning, pre-treatment & adherence to IFU?

500

Provide one (1) challenges that SPS will face when loaner instruments not delivered within 48hours

What is

> Insufficient time to process

> Creates frustration to SPS staff

> High vulnerability to create error

> Staff needs to be educated on processing of unfamiliar instruments

> Loaner instruments can be very complicated or sophisticated devices that are new to SPS

500

A team of multidisciplinary stakeholders who are responsible for establishing the proper reprocessing   of all RME within the medical facility.

What is RME Committee?

500

It is the process which all forms of microbial life (bacteria, viruses, pores & fungi) are completely destroyed.

What is Sterilization?

500

A program in place to ensure appropriate and safe reprocessing is being performed by SPS staff

What is QUALITY ASSURANCE PROGRAM (QA)?