Cityworks is your friend
Know Your Assets
More know your assets, it's that important
Roadway and Bridge Potpourri
David Deranzio, the man, the myth, the legend
100

True or False - Cityworks is fun and simple to use.

What is TRUE!!!   

100

Post, Block, Reflector, Panel, and End Terminals are components of what asset.   

What is guardrail?

100
4 of the 6 asset classes the Roadway and Bridge Section is responsible for.  

What is Handrail, Guardrail, Sidewalk, Bridge and Culvert, Roadway, and Traffic Signs?

100

The Section that everyone here works in.   

What is the Roadway and Bridge Section? 

100

True or False:  David is building a robot to take over the world.  

True
200

True or False - service requests are required to create work orders.

What is false?   Work orders do not require service requests.   
200

We replaced 22,620 linear feet of this asset in Fiscal Year 2024.   

What is sidewalk?   

200

The total length of this asset is 1,072 miles.   

What is sidewalk?  1,072 miles is the approximate distance driving from Pinellas County to New York City.

200

This Roadway and Bridge employee has worked for Public Works the longest amount of time.   

Who is Bob Taylor? (38 years - started with Pinellas County in 1987)

200

David played this sport in high school.   

What is football?

300
The action performed when you don't understand something in Cityworks.   
What is ask for help?


300

These assets would cost the most money to replace.   

What is bridge and culvert?   The 200 bridge and culvert asset have a replacement value of $1.2B

300

The age in years of our oldest in-service bridge - within 5 years.  

What is 102 years old?  (98 - 107) This is the Orange Street Bridge (#154101).    

300

The division within Public Works that the Roadway and Bridge is in.   

What is the Transportation Division?

300

David was born in this place, which an "Iced Tea" inspired alcoholic drink takes its name from. 

What is "Long Island", New York?  

400

Items required on a work order to account for time and cost, abbreviated as ELM.   

What is Equipment, Labor, and Materials?

400

The total lane miles of roadway we maintain within 250 miles.   

What is 2,558 lane miles? (2,308 - 2,808)

400

Asset that is made of either aluminum or galvanized steel.   

What is handrail?  

400

Hurricane Milton made landfall in Florida on this date.

What is Wednesday, October 9th, 2024?

400

David went to college at this school.   

What is the University of Florida?  

500

This is always required to be attached to a work order.   

What is an asset?   

500

The total number of stop signs that we maintain within 500.  

What is 7,123 stop signs?  (6,623 - 7,623)

500

True or False:  Roadway and Bridge has an asset management system plan that details how all of its assets are managed within the county's asset management system.  

True - this document does exist.   

500

The number of employees in the Roadway and Bridge Section within 5.   

What is 65?  (60 - 70)

500

Before moving to Florida David lived in this "Garden State".    

What is New Jersey?