Interface Agreements
Random ROC
Outages
Y6s
Lighthouse
100

When we create a ticket for the NOC and dispatch a fiber crew simultaneously.

What is Dual Dispatch

100

Daily tasks are here.

What the assignments page?

100

The job type that prevents new outage orders from being created when an alarm triggers

What is a Planned Outage

100

How we notify a tech that we have assigned Y6 during his/her shift

What is make a phone call/ Positive Contact 

100

The quickest way to determine if we have potential fiber events

What is check hourly for 100% offline nodes 

200

The type or condition of the ticket we create when referring a non-impacting ticket to ISP

What is HazCon

200

Process information, and ROC policy updates are located here.

What is Chalk?

200

The time interval that we should call for an update once a tech arrives on site

What is 1 hour

200

The number of Y6s for a single customer in a 30 day period that requires a Tier 1 email

What is 2

200

A specialists should do this when there is no tech schedule in Lighthouse, and an outage needs to be assigned.

What is escalate to ROC Supervisor?

300

The INC relationship we use when an overrun ISP ticket caused alarms for the ROC

What is Caused By

300

Monitored Power Supply information can be found here.

What is Continuity?

300

This is claimed during outage triage.

What is the alarm ?

300

The SLA for CASH PASS Y6.

What is 2 hours

300

Where you find jobs that are out of SLA

What is the Aging Orders tab

400

The INC relationship we use when RSC assigns a ticket for an outage that we are already working

What is Duplicate of

400

Where we direct OSP to find processes that impact them

What is the OSP Reference Page on Chalk ?

400

Where you would look to see if there have been prior IRIS tickets for a node

What is the NOC Portal

400

The application that FTs use to submit a tech assist request

What is Techmobile ?

400

Where do you look to see the weather moving across our region?

What is the storm dashboard

500

A requirement for ROC to dispatch fiber for an Enterprise customer

What is a FT site visit to rule out power & equipment

What is an INC ticket assigned to the ROC


500

New WFM platform that will be in use 4/23

What is ASPECT?

500

The source of truth for determining if a node truly has call deflection in place

What is the IRIS Dashboard

500

The job type that we create when there are multiple Y6s for hard down or seriously degraded issues in a single node

What is Create a Y5 Unplanned Outage with CD

500

Where you look to see if all techs on shift have jobs assigned to them

What is the Team Routing Dashboard