Prudent Digging Techniques
Proper Preparation
UNDERGROUND COLOR CODE
Color Code II
100

For Installation of new or replacement URD cables, parrelling cables bot in conduit, the new trench should be excavated How many inches from the marks?

What is 24"

100

Use of non-powered equipment operated tools such as shovels, picks, bars, etc. in the hand of the operator.

What is Manual Excavation

100

RED PAINT

 Electric

100

Pink

Temporary Survey

200

What is the lawful start time to begin digging

72 Hours

200

The length of each PA1Call Ticket should not surpass this amount

What is 500'

200

YELLOW

Gas

200

Purple

Reclaimed Water

300

What is the waiting time for emergent locate requests

One Hour

300

The amount of days you have after demobbing a job site to notify the one call center if you return to the job

 What is 2 days

300

ORANGE PAINT

 Communication

300

You call this number before you Dig

What is 811

400

Work must begin in how many days

10 Days

400

These will help determine if the marks found in the field are accurate

Maps, Work Orders & Prints

400

White

 Proposed Excavation

400

The horizontal space within 18" of the outside wall or edge of a line or facility

What is Tolerance Zone

500

You must prudently do this when working within tolerance zones of located or equipment to verify facilities location

Hand Dig

500

This should be done when working within the tolerance zone of locates

What is Hand Digging

500

Green

 Sewers

500

What does the acronym STAR stand for

Stop, Think, Act, Review