Safety 101
Hazard Control
Construction Site
Scaffolding
Engineer on Site
100

the state of being ‘safe’, the condition of being protected from harm or other danger.

Safety

100

The process of removing the hazard from the workplace.

Elimination

100

Road and passage way should be kept clear of _____ at all times.

obstruction

100

what color tags shall be hanged at each scaffolds access that have been inspected and are safe for use.

Green

100

Using _____ to warn workers of a hazard.

signs

200

An event that is: Unexpected, Unplanned, Unwanted that did not result in injury or damage (but could have)

Near miss

200

The act of replacing something with another thing… in this case, a hazard is replaced with a less hazardous one.

Substitution

200

This must be provided where person is liable to fall more than 2 meters.

Handrails

200

A fall protection equipment shall be used when working in a height of _____ and above

2 meters

200

Personal protective equipment (PPE) refers to anything workers _____ to help protect them from a workplace hazard.

wear

300

An unfortunate incident that happens unexpectedly and unintentionally, typically resulting in damage or injury.

Accident

300

The use of _____ as the main method to control exposures should be limited to situations where elimination, substitution, engineering, or administrative controls are not practicable.

PPE

300

All Construction Personnel must undergo _____ before starting to work.

Safety, Health, Environmental and Security Orientation and Training/Induction

300

Timber/bamboo scaffolds shall be limited to what height of from the ground or base.

6 meters

300

Engineering controls are methods that will remove the hazard at the _____, before it comes in contact with the worker.

source
400

Which category of accident costs includes Investigation of the incident; Cleaning up of incident site; Disruption in production?

Indirect Costs

400

It involves developing procedures to ensure the work conducted in a way that minimizes the hazard.

Administrative control

400

The cost of the CSHP must appear this way in bid/tender documents.

Seperate Pay Item

400

Scaffold inspection should be performed at this frequency during use.

Daily and every shift

400

A site-fabricated supported scaffold exceeding 6 m must be designed and inspected by this professional.

Structural Engineer

500

These are the three steps of control, in correct order.

→ Identify → Evaluate → Control

500

Replacing solvent-based paint with water-based paint is this type of control.

Substitution

500

At what distance from a sidewalk or public road is a safe covered walkway required for pedestrians during building construction?

Less than 2.3 meters (or 7ft)

500

Scaffold activity must stop when wind velocity exceeds this speed.

48 kph

500

Oil spilled across a walkway is classified as this.

Unsafe condition