LOCKS
PERMITS
STEP BY STEP
SAM
OLANDS
100

These locks are personal locks used by all contractors and are used to indicate the individual who is working on the equipment is a contractor

What are purple locks

100

This tag is called a Lock, Tag & Try LOTO Permit

What is a green tag

100

Step 1 in the 9 step LOTOTO process

What is identify the energy sources

100

The acronym SAM stands for 

What is Safe Access to Machinery

100

The year the Oland family bought this property on Agricola Street

What is 1905

200

This lock is affixed to the energy source in a single-point isolation or on a hasp or a lock box as a part of a multi-source isolation. Each employee is issued one.

What is a Blue lock

200

The Lock, Tag & Try LOTO Permit must be completed by _____________ coordinating the LOTO of a piece of equipment.

Who is the authorized person

200

Step 7 in the LOTOTO process. Often referred to as the most important step. This is the last step before entering the machine to service. 

What is the "try" step. Ensure that the machine won't power up after it has been locked out. 

200

In order for a SAM to replace a LOTOTO the work must be 

What is a minor servicing adjustment

200

The year in which the Oland family purchased Alexander Keiths

What is 1928


300

These locks are used in the field to secure single lockout points during multi-LOTO activities. Authorized personnel install these locks, and they are accompanied by red and white Danger Tags on each lock

What is a red lock

300

The manager checks the green tag for accuracy and retains it for this many days before turning it into the safety office.

What is 30 days

300

Step 9 in the LOTOTO 9 step process

What is the release from LOTOTO. Make sure all tools have been removed from machine, clean any resulting mess, undo the locks and restore the machine to service. Be sure to notify all parties that the LOTOTO is complete.

300

To be considered a minor service adjustment the work must be _________. Which means it occurs during normal run cycles.

What is routine

300

The year in which Labatt purchased Olands

What is 1971. For a reported 12 million dollars

400

These are the only locks that can have common keys

What are yellow locks

400

The completed permits are placed on the lock on the single source or ____________, where it is visible and available to other employees who may be attaching locks.

Where is on the Lock Box

400

Step 2 in the LOTOTO process. This step is all about communication and collaboration.

What is the notification step. Notify all affected parties that a LOTOTO is about to take place so they can anticipate downtime

400

To be considered a minor tool adjustment the work must be __________. Which means it occurs regularly as part of production

What is repetitive. 

400

The year the Oland family built the Bluenose II

What is 1963

500

These locks are required for multiple-point LOTO with more than one person involved in the LOTO. They are also required whenever a “change in control” of a LOTO activity occurs or is expected

What are Green locks

500

The only type of lockout that doesn't require a green tag

What is a confined space entry. The confined space permit has LOTOTO requirements built into it and therefore doesn't require the use of a green tag.

500

Step 6 in the process. This step takes place immediately after the physical lockout is done.

What is releasing the stored energy.

500

In order to conduct a SAM you must initiate the following

What is an E-stop and a secondary safety device (disconnect, etc)

500

When Schooner was produced for the first time

What are the 1950s