Safety Awareness
Environmental & safety
Fire, Cutting & PPE
Mat. handling, respirators, spotter, vehicles
Excavation,PRCS,
MEWP,ladders,Rigging
100

When a worker can visit job site and work

After safety orientation is complete

100

What it mean SWPPP and where is need it

Storm water pollution prevention plan; and shall be installed to prevent any chemical, like concrete ,diesel or any chemicals getting to a water body; creeks, bayou

100

Fire extinguisher types and how often required to be inspected and PASS means

Type A; for combustibles; Type B for Flammables; type C for Electrical and Type D for metallic fire; typical ABC ; Monthly (visual, pin, cylinder damages); Annual (state certify, re-load,etc)

Pull the pin, Aim the fire, squeeze, sweep



100

How you are handling materials

Use proper lifting /handling techniques and PSC protocols

100

pre-excavations process and permits; inspections

do assessment/ check list/ permit; call 811 locate underground utilities; CP inspect /evaluate before allowing entry; and 5' deep or more will need of a protective system

200

where can you smoke at open field site during working hours

Smoke in designated areas is permitted; away from equipment, flammables, combustibles, equipment

200

who keep all the SDS on the field

Mainly Supte, HSE, or work and tool trailer have available and access to any SDS from chemicals used

200

What we normally do when gas cylinders are not in use

Close the valves/ set cap, remove regulators and gauges and follow company's protocols

200

which respirator has to be use, and seal tests explain

Select an appropriate respirator to control the hazard; provide field test for negative and positive test

200

In PRCS who sign the permit, and steps before entry; people and equip. involved 

PRCS means; permit required confined space; CP sign the permit before personnel entry; Physical and Atmosphere evaluation is required; shall keep monitoring during the task; 

300

If is there not Dumpster available where can I leave construction trash & debris

Is not permitted to accumulate general trash/debris/dunnage in work areas

300

Where can we clean concrete trucks and pour any concrete debris

Shall be into concrete washout containments only

300

Typical PPE required on the job site; and when you are grinding, or cutting (440 stihl ); explain

hard hat, gloves, work shoes, ear plugs, glasses plus face shield while exposed to debris while cutting or grinding

300

hand tool recommendations and protect yourself 

be sure has a guard moving or rotating parts; use proper grinding disc for grinder size /type (RPM)

300

What is right angle to set up an extension ladder; how to use it

Inspect for any damages; Angle is 4:1; face the ladder/ maintain 3 points of contact; do not carry materials; extend it 3 ft above landing area

400

What is frontline daily safety planning process knowing as

STAR or pre-job briefing

400

LDH, safe water act, TCEQ work under EPA

They are state offices to follow all EPA standards in order to prevent contaminations in water, air and soil

400

PFAS and its components

Personal Fall Arrest System; harness, lanyard, suspension trauma protection, SRL (yoyo)anchor point

400

what is required to be a spotter or flagger

Trained on duties /hazards/communication methods/ signals

Establish correct communication method between spotter and operator

400

Main info before lifting any load

Know the weight of load; use adequate rigging equip. ; inspect every rigging like synthetic sling, wire rope or chain have legible capacity tags; determine right hitch

500

It is the offices only ones empower to stop a unsafe task/ work

any worker has the stop work responsibility if unsafe action taking place

500

what it means SPCC plan or when I need it

Spill Prevention, Control, and Countermeasure (SPCC); implemented to prevent and control almost any oil or any chemical spills

500

OSHA's requirement as fall protection systems

PFAS, guardrail, ramp, cover holes, vertical and horizontal life line; descender for self rescue

500

Basic steps and requirements to drive company truck; 360; accidents while driving

Conduct 360 walk around prior start/ move vehicle & equipment; back alarm works; all occupants wear seat belt; avoid distracted driving, avoid mobile device use(cell)

500

how can you describe a lift plan for a crane

Daily inspection; knowing the weight of load; establish a communication between operator and rigger; set up swing radius; tag lines use to control the load; load not be suspended when is not attended; crane on stable/ level surface