The proper cutting technique.
What is cut away from your body and apply a firm and consistent pressure.
The amount of people needed to check in a truck.
What is 2 people.
The weight at which a team lift is required.
What is 50 pounds.
The PLE inspection form.
What is the WMW-119.
The systematic relocation process.
What is the move function.
The proper PPE when outside.
What is a yellow vest.
The equipment utilized for unloading trucks.
What is an RC.
The proper techniques required to lift a load.
What is bend at the knees and utilize your power zone.
The proper procedure to have a conversation on a machine.
What is step off your machine.
During the pick process the second step upon discovering inaccurate quantities.
What is submit a ticket.
The proper PPE for the RM.
What is safety eyewear.
The lock used for trailers.
What is a Glad Lock.
The lifting power zone location.
What is from mid thigh to mid chest closest to body.
The proper distance at which you need to shut off your machine.
What is 25 feet.
The correct process to follow when a pallet comes off the truck damaged/ broken.
What is restack fixtures onto a new pallet.
The radius around a machine where nobody can step foot into.
What is the 4 foot Halo.
The maximum weight that can be loaded on our trailers.
What is 44,000 pounds.
The highest stack of pallets that can be manually down stacked.
What is 6 pallets.
The phrase declared before lifting the forks of the RM.
What is 20 feet.
The acceptable locations to utilize the rotator to dump fixtures.
What is outside.
The distance a machine has to be from a dock door.
What is 4 feet.
The amount of people allowed on a trailer while operating machinery.
What is 1 associate.
The appropriate time to carry a fixture over your head.
What is neva eva.
The information found on the capacity plate on a machine.
What is the Maximum lift capacity, load center, truck weight.
The acronym QCC stands for this.
What is Quality Control and Compliance.