This form must be completed to initiate any changes to raw materials, processes, or equipment at the site.
What is the Management of Change (MOC) form?
This is the safety zone distance required between industrial mobile equipment and pedestrians.
What is 10 feet?
This individual is responsible for issuing Hot Work Permits and ensuring all necessary precautions are in place before hot work begins.
Who is the PAI (Permit Authorizing Individual)?
This form is required during upset conditions to identify hazards and develop a safe solution.
What is the RADAR+ form?
This is the main purpose of a fall protection system in the workplace.
What is to eliminate or mitigate the risk of falling from heights?
MOC is not required when performing this type of maintenance on existing process equipment.
What is inspection, repair, or replacement in kind?
These conditions must be met for mobile equipment to be considered in a safe state.
What are equipment placed in neutral or park, parking brake set, and load lowered to the ground?
This period of time must pass after hot work is completed before the Fire Watch can notify the PAI and leave the site.
What is 30 minutes?
This action must be taken when handling boards near pinch points or moving equipment to avoid finger, hand, and arm injuries.
What is ensuring equipment is locked out?
Height that triggers need for fall protection.
What is 4 ft?
This form must be completed before making a change in an emergency situation.
What is the Emergency Management of Change (E-MOC) form?
This is required when an employee must work inside the 10-foot safety zone.
What is a RADAR+?
This is required in all areas that are not designated for hot work.
What is a Hot Work Permit?
This must be used whenever possible to avoid direct hand contact with lumber and reduce the risk of injury.
What is a tool?
This component of a personal fall arrest system connects the worker's harness to an anchorage point.
What is a lanyard or self-retracting lifeline (SRL)?
Name one individual that is responsible for signing off on the MOC form once all action items are complete.
Who are the Safety Manager, Environmental Manager, Operations Superintendent, Engineering Superintendent, and Unit Manager? (pick one)
This action must be taken before backing up mobile equipment.
What is turning and looing over both shoulders?
This monitoring position inspects the hot work area every 30 minutes for at least 6 hours after the fire watch is completed.
What is the Hot Work Monitor?
Employees must be aware of this when removing boards from racks or maneuvering boards to prevent pinching or crushing injuries.
What is hand placement?
This action must be taken when a worker notices a defect in their fall protection equipment.
What is removing the equipment from service and reporting the issue?
This type of change communication is required when modifications to personnel safety, environmental conditions, or operating procedures are made.
What is the Notice of Change (NOC) communication?
This is required when an operator is observed operating mobile equipment in an unsafe manner or after substantial damage to company property.
What is refresher training and evaluation?
This action must be taken when smoke, sparks, or flames start spontaneously.
What is filling out a Hot Work Permit and treating it like a hot work event?
This step is required when handling or removing lumber on unlugged chains at stackers to ensure safety.
What is stopping the chains?
When inspecting a body harness, workers should check for these issues, such as cuts, burns, or broken stitching.
What are signs of damage or wear?