Field Measure
Miscellaneous
Bidding
Code Requirements
Product Knowledge
100
What are two methods of doing a field measure?

tape measure, laser measure, count cavities, step off

100

What do we charge customers for RESchecks?

Nothing

100

When is TBD as an address allowed in SOS?

Never

100

What batt R-value is used in a 2x4 exterior wall?

R-13 or R-15

100

What is the difference between white and orange canned foam besides the color?

The fire rating

200

Besides measuring a project what are two other reasons for a field measure?

is the job ready (passed 4-way), hazards (electrical, power lines, trenches, holes, clean workspace), site accessibility (road clearance, mud, snow, trees), noise and allowed work hours, framing changes

200

What is the Sunpro multiplier for insulation and garage doors?

4 times

200

When bidding jobs that are out of state. What is the form you must fill out?

Preliminary Information Job Card

200

What batt R-value is used in a 2x6 exterior wall?

R-19 or R21

200

What type of foam works best for sound suppression?

Open Cell

300

What is the name of the inspection that must be passed before we can insulate?

4-way

300

What is Sunpro's preferred method of payment?

Credit account

300

What are some of the computer programs we use to do plan bids?

Togal, Planswift

300

What is one area draft stop is required?

Basements

300

What is the government website that can give you insulation information, knowledge, application methods?

Department of Energy

400

When performing a field measure what notes should be shared with the installers?

insulation types, heights, difficulties, applications, equipment needs, safety gear

400

What are two reasons and purposes of taking a customer/client to lunch?

upcoming jobs, past and current performance, price increases, new products or services, establish relationship of trust

400

What status should your job be in when you turn it over to Production (Cesar)? 

Job Ready

400

What two locations is an attic sticker placed for final inspection?

attic opening, electrical panel

400

Name two major insulation manufacturers in the US?

Owens Corning, Johns Manville, Knauf, CertainTeed

500

Besides the 4-way inspection, what other factors need to be considered before we can insulate?

Dried-in, windows and doors installed, low voltage, HVAC, plumbing, other trades, weather conditions

500

How many bids per week does a salesperson need to submit? What is minimum dollar amount per week?

15 bids per week

$28,846 per week

500

What program and report do you use to check your commission?

BisTrack, Commission V2 Report

500

What material must be used around chimney flues?

Mineral Wool (Rockwool)

500

Name two major reasons to insulate a home?

slow heat flow (R-value=Resistance to heat flow), manage sound, energy efficiency, code requirements