Responsible for Hurricane Plan activation and following the sequence of the Hurricane Plan Phases.
What is Seadrift's Management Team
SP-210-500
What is the Safety Credit Program.
Non-essential personnel are responsible for completing their tasks associated with their area's what?
What is Hurricane Checklist
SP-210-500
The count of Seadrift's Cardinal Rules
What is 7
SPL105
Group responsible for reporting to the site at the scheduled time and assist in finalizing Plant preparations and shutdown, monitor's equipment operating during hurricane, and initial damage assessment.
What is Hurricane Team
(SP-210-500)
Documentation required to use mobile phone in process areas.
what is written approval and Hot Work Permit
SPL112, section 4.2 and Appendix A
Seadrift's Shelter in place buildings.
What are Admin (main hallway), Coker Control Room, Maintenance office building (lunch room), and Permit Bldgs.
SP-210-100
Maximum allowable air pressure used when blowing dust, metal shaving or dirt from your clothes.
The wind speed where Operations announces the upgrade from safety glasses to goggles.
What is ≥30 MPH
SP-210-100
the Admin Building 2nd alternate muster point
Contractor Parking Lot
SP-200-020