Permitting
Plan Check
Inspection
Multi-Family
Code Enforcement
100

Typical plan check and inspection fees are based on this

What is construction valuation

100

Posts at the ends of shear walls are designed for both ____ and ____ loads

What is tension and compression

100

Placed along the outside edge of rafter tails

What is facia board

100

This must be obtained when an owner refuses access to a property

What is an inspection warrant

100

This is posted on a building when work has started without a permit

What is a stop work order

200

A “building” permit type should be applied for when ____ of the other permit types apply

What is none

200

Means of egress illumination level typically shall not be less than ____ at the walking surface

What is 1 footcandle

200

Sheathing is typically edge nailed at ____ o/c and field nailed at ____ o/c

What is 6” and 12”

200

The annual base program fee is ____ dollars per unit

What is 138

200

A retaining wall under this height does not require a permit

What is 4’

300

Pre-Approved ADU Plan submittals must include this to specify the ADU location

What is a site plan

300

A commercial dishwasher discharging into a floor sink must be plumbed with this

What is an air break or air gap

300

Used to keep rebar off the dirt

What are adobe blocks

300

Muchos residentes hablan este idioma

Que es Espanol

300

All official notices should be sent via this type of mail

What is certified

400

This condition is required for select areas not within Engineering’s jurisdiction

What is Sanitary District Approval

400

Accessible car parking spaces must be ____ wide with a ____ wide access isle

What is 9’ and 5’ (108” and 60”)

400

A permit is not required for this, which includes driveways, sidewalks, patios, etc.

What is flatwork

400

____ walkways must be inspected by a non-city professional every 6 years

What is elevated

400

Removing a red tag is this type of crime

What is a misdemeanor

500

This license classification is for electrical contractors

What is C-10

500

A new SFR using prescriptive approach must have ____ rated insulation in its floor

What is R-19

500

Concrete walls poured flat on site and craned into place are called this

What are tilt-up

500

A NOV should include a period of time between ____ and ____ to make corrections

 What is 24 hours and 120 days

500

These are assessed when owners fail to comply with notices

What are citations or fines