Operator Qualifications
For Apprentices
O&M/Standards
Gas Emergency
Inspecting a Servicve Regulator
100

Where is the electronic version of the Operator Qualification (OQ) Written Plan located?

What is our Iberdrola Sharepoint

100

Name the three Classifications of a Warning tag

Class A, Class B and Class C

100

Procedure 7.350 covers 

What is Residential Service & Vent Inspection

100

Name three characteristics of CO

What is Colorless, Odorless, Tasteless, Toxic, slightly lighter than air

100

Also known as Normal Load

What is Operational Load

200

How long must you wait after failing an OQ test a 3rd time before retaking it again?

What is 6 months

200

The abbrevation of BTU stands for 

British Thermal Unit

200

In our O&M, Section 4 covers

What is Corrosion Control

200

DAILY DOUBLE!!! Events requiring IMMEDIATE notification, the PSC is called within how many minutes from the company first being aware? 

What is 30 minutes

200

Operational load outlet pressure SHALL be between what pressure in inches of water column

What is 6-7" W.C.

300

What spacific OQ task number for exchanging meters is needed by Shop personnel?

What is 72B

300

Regulators SHALL be installed on all services running above what pressure?

What is above 14" Water Column

300

What sections covers Warning Tag procedures? 

What is section 10.150
300

A flashback at an appliance is considered to be what? 

What is an Incident or Accident (not an explosion).

300

A regulator shall be inspected if its been inactive for how many years

What is 2 years or more

400

DAILY DOUBLE!!!How long are you locked out after failing a exam before being able to take it again?

What is 48 hours

400

While performing a Curb Valve inspection you check for accessibility, leaking gas and what

What is verify you can get a valve key on it (in the event of an emergency) 

400

Where is our O&M/Standards located on the Intranet? 

What is our Iberdrola Sharepoint site

400

CO incidents that cause evacutaion but with no apparent fatalities or injuries are reported to the PSC when.

What is reported by noon the next business day. 

400

Outlet pressure shall be observed under normal operational/normal load or 

What is minimum/lock-up load (no load or pilot only conditions). 

500

What revision of the Avangrid OQ Written Plan are we on? 

What is revision M (March 31, 2023)

500

All required on-line safety training is due when?

What is November 30th
500

Construction Standards TM5.60.20 describes

What is General Meter Set Construction

500

Carbon Monoxid is absorbed into the blood how many times more rapidly than oxygen?

What is 210 times more rapidly

500

This is a photo of what

What is a Vent Terminus