What PPE must be worn at all times when on the plant floor, even during breaks/lunch?
Safety Glasses, Vest and Shoes
A single unit/cabinet is referred to as a ________.
Section
After gathering bus and kit parts, engineering drawings, and BOMs, what do you do next?
Assemble frame/sections based on engineering drawings
What is the name of the program we use to pull up Blueprints?
Electronica
A JHA (job hazard analysis) identifies the dangers of a specific task in order to reduce what?
Reduce the risk of injury to workers
Line Up
Quality
Health & Safety
Environmental
When section assembly is completed, where do you send the section?
Wiring Area
Which view tells you how tall the section is?
Front View
A _____ is an incident that, given a slight shift in circumstance, would have caused an injury, major property damage, or an environmental impact. Also known as “close calls”.
What does the Main/Service section do?
Monitors and controls the incoming power
Define the term calibrated tool. (Not an example of one)
A device, that when used, provides a value or applies a force.
When the wiring is complete, where do you send the section?
Test Area
Which view do you use to determine how deep a section is?
Top View
To use a fire extinguisher, use the acronym PASS. What do the letters PASS stand for?
P ull the pin
A im at the base of the fire
S queeze the lever
S weep side to side
What does the distribution section do?
divides and distributes the power
What do you do if a part is lost, damaged, manufactured incorrectly, or doesn't match the drawing?
Complete an NCR form.
When testing is complete, it goes to closing. When closing is complete, where do you send the section?
Green Tag
This is a parts list and gives the description of each part, quantities, as well as a specific part number. Parts will reference back to the engineering drawings.
BOM
Per our Quality, Environment, and Health and Safety Policy, what does the P in “COPS” stand for?
Prevent defects, pollution, and injury to health.
What does the vertical bus do?
carries power to and from all the breakers
What do you do when the job design isn't correct and usually requires an engineering review?
Complete an OEPR.
When Green Tag is complete, where do you send the section to?
Shipping
Main drawings/assemblies can be broken down into _____________, so that you can drill down at look at specific build instructions.
sub-assemblies