Power Up
What Does That Mean
Counting in Watts
Test Your Knowledge
This and That
100

CSG  

Community Solar Garden

Central solar facility is constructed for multiple customers, who each subscribe to a portion of the project

100

Net Metering

Billing mechanism that credits solar energy system owners for the electricity they add to the grid

100

Investment Tax Credit

A dollar for dollar reduction in the income taxes that a person or company claiming the credit would otherwise pay the federal government


100

What percentage of Xcel Energy’s power is produced by solar today?

3%

100

In what state or states can community solar subscriber’s absorb the entire output of a CSG?

Maine

200

O and M

Operations and Maintenance

in charge of training, cleaning, work practices, and surveillance of the gardens

200

Mechanical Completion

Point in the project when construction is complete and subsystems are ready to be handed over to the commissioning team

200

How many Watts (W) is in a Giga Watt (GW)?

1 billion watts

200

How many megawatts of energy from community solar gardens is produced in Minnesota ?

860 megawatts of community solar gardens

200

What benefits do our subscribers have when they join a community solar project?

Monthly electrical savings

Ability to support the reduction of CO2 emissions

Going solar without having to invest any money

300

MIPA

Member interest purchase agreement

A way to express ownership in an LLC

300

Substantial Completion

The project, or a portion of the project, is fit for its intended use

300

How much community solar was installed in the United States in 2022?

20.2 GW 

300

Approximately 30% of the solar energy that hits the earth is reflected back to space, what happens to the other 70%?

The other 70% is absorbed by clouds, oceans and land masses.

300

True or False

In the Maine Net Energy Billing Program, small general service accounts can take part both the kWh Credit Program and Tariff Rate Program.

TRUE

400

COD

Commercial Operation Date

The date under a long term power purchase agreement and the facility starts to generate power to earn revenue


400

Permission to Operate

The final step in the interconnection process, where you receive approval from the utility to activate your solar system and begin generating electricity

400

What characteristic in a solar project has more impact on profitability?

Yield of the project as it impacts long-term cashflows for revenue

400

Which entity tracks the renewable energy certificates in Minnesota that we produce?

The Midwest Renewable Energy Tracking System.

400

How much solar energy per square foot hits the earth every year?

342 watts of solar energy fall upon every square meter of earth every year

500

EPC

Engineering, Procurement, and Construction

A solar company that provides Engineering, Procurement, and Construction of a full solar system

500

Notice to Proceed

Written Notice to Proceed is issued to the building party to commence the work as stated in the agreement

500

What is today’s US central bank interest rate?

5.25% (highest in 16 years)

500

Photovoltaics that can follow the sun can increase the solar energy potential in what areas?

Areas that are farthest from the equator

500

Which country uses the most solar energy?

China