About Solar
Code Names
Misc.
Process 1
Process 2
100

Is solar energy a direct or indirect form of energy

Direct

100

What is UB?

Utility bill

100

What is the typical HOI amount needed?

$300,000

100

What do you do when you have an email that says: needs customer to contact power company or AHJ with a duplication of application?

Reach out to project coordinator through slack and make task

Also note in permitting/NEM notes

100

When you get an email that states a permit is ready for pick up, what is the process?

Figure out cost of permit

Mark permit "approved" in Quickbase

Enter total cost of fee in Quickbase

Make work order to pick up

Get a copy of permit and upload to Quickbase/Drive

200

What type of energy does solar energy generate?

Electricity

200

What is IA?

Installation agreement

200

What is something we don't know about you?

???

200

When your permit is approved and is online what do you need from the AHJ?

Approved permit

Approved plans

Approved inspection card (if applicable)

200

What is the process for corrections from AHJ or utility?

Changelog (changing with CRM 2.0)

300

Who can benefit from solar?

Anyone with solar

300

What is HOI?

Homeowners insurance 

300

When we use a sub contractor for install, what address do we use for permitting and NEM?

The sub contractor's

300

What is the process to get checks?

Fill out check log with paid to, job name, description, and amount. Slack Peggy that check is needed

300

How do you know a changelog is complete?

A task email should come to you

Complete the changelog and action item

400

What are panels made of?

Silicon block

400

What is FIC?

Final inspection card

400

When you are missing a meter number, what do you do?

Check JOT form

400

When do you need to do a PO? Where do you do the PO?

Any time you use the credit card

In the financial portal

400

How do you fill out the PO log?

Date:

Cost code: 032 permit fees

Customer/Job name: name x2

State: 

Employee name: your name

Vendor: Utility/AHJ name

Description: Net meter app, Permit fee

Cost:

Payment method: Visa 7335

Authorized by: your name

Region:

Shipping company: Online

Expected arrival date: 

Upload receipt and check receipt reviewed box

500

What are types of traditional panels?

Monocrystalline solar panels

Polycrystalline solar panels

500

What is MPU?

Main panel upgrade

500

What is a net meter?

Bidirectional meter for solar

Billing mechanism that credits solar energy system owners for electricity they add to the grid

500

What should we be doing every day?

Checking your emails (NEM and permitting)

Corrections/ changelogs

Submitting NEM and permits

Following up and marking Quickbase with approvals

Following up on overdue projects

500

What spec sheets are needed when submitting for a permit? Where do you find them?

Modules

Inverter

Optimizers

Racking

Grounding (if applicable)

In the Cut Sheets folder