Emergency Action Plan
Excavation Safety
Vehicle & UTV Safety
Heavy Equipment Safety
Confined Space
100

This team responds to injuries and incidents on site.

What is the Construction Emergency Response Team (CERT)?

100

Spoils/equipment must be kept at least this far from the edge of an excavation.

What is 2 feet?

100

All employees must do this type of parking on the KNC project.

What is reverse parking?

100

You must stay at least this far away from heavy equipment unless permission is given.

What is 50 feet?

100

Confined space is defined by being large enough to enter, having limited access/egress, and being _____.

What is not configured for human occupancy?

200

For a medical incident, these two groups respond.

What are site medical and Site Supervision?

200

At this depth, access/egress must be provided.

What is 4 feet?

200

The on-site speed limit is this oddly specific number.

What is 9.37 MPH?

200

Before walking around heavy equipment, you must do this and get this.

What is make eye contact and receive permission from the operator?

200

This is one listed potential hazard category:

What is hazardous atmosphere?

300

The emergency response team is described as responding to all of these two things on site.

What are injuries and incidents?

300

At this depth, excavations must be protected using “Slope it, Shield it, Shore it.”

What is 5 feet?

300

If you don’t follow the reverse parking rule, your vehicle may face this consequence.

What is being towed at the owner’s expense?

300

This always has the right of way on site.

What is the larger piece of equipment?

300

 This hazard is described as material that can engulf an entrant.

What is engulfment?

400

The “EAP” abbreviation stands for this.

What is the Emergency Action Plan?

400

At this depth, a Professional Engineer in soil/protective systems must approve the excavation plan before work begins.

What is 20 feet?

400

Before operating a UTV/vehicle, you must do this inspection and this walkaround.

What is a daily inspection and a 360 walkaround?

400

The rule says you must do this before walking/working around equipment.

What is make eye contact with the operator and be given permission?

400

“Don’t Enter a Confined Space Until” includes this monitoring requirement: pre-entry and continuous monitoring, with readings recorded every ____.

What is every two hours?

500

 In the EAP description, this is the order of response for a medical incident: first ___, then ___.

What is site medical first, then Site Supervision?

500

List the 4-day excavation policy sequence in order (Day 1 through Day 4).

What is: (1) submit excavation request form on the Centurion KNC Excavation website, (2) KNC Dig Team reviews and marks utilities presence, (3) Walk and talk to discuss utilities/means/methods/safety, (4) after permit approval, excavation operations may begin?

500

Name three UTV/vehicle requirements listed (not counting seat belts).

What are: company name on the vehicle, flashing light, and working headlights?

500

Combine two requirements: minimum distance rule + the condition that allows you to be closer.

What is “Stay 50’ away unless the operator gives permission”?

500

Name four of the “Don’t Enter a Confined Space Until” requirements.

What are: training verified, permit obtained/completed, confined space labeled, monitoring & documentation performed, forced air policy, barricade/opening protection, and fall protection/retrieval device installed? (Any 4 from the slide.)