Early Morning Originators
Working the Turn
Terminators
100

The Security Sheet has to be done by this time

Before Boarding/40 Minutes

100

The STAAGE prep must be submitted by this time for TURNs

10 Minutes Prior

100

This has to be brought in at the end of every terminating flight

Headset Box (Wands & Headsets inside)

200

The STAAGE prep must be submitted by this time for EMOs

D-45
200
The amount of safety stops needed for bringing in GSE from another gate

2 Safety Stops

200

These need to be chocked for all terminating flights

Both main landing gear and nose gear

300

This does not need to be installed for EMOs ONLY

The Tail Stand

300

The Gate Lead must always have this piece of equipment on them during their shift

Radios

300

What needs to be checked prior to finishing the Terminators

Both bins (ensuring they are empty), all wheels chocked, and power/air connected