Pool/Misc
Ipad/Misc
Purchasing and Production
Fun Facts
100

What two types of pools will the pool division sell?

Fiberglass and Gunite 

100

What should you do on your Ipad first thing in the morning and right before you leave for the day?

Clock in and out

100

Who do you call when you need additional tools or materials for your crew?

Rich

100

What color flower is a Sunflower

yellow

200

What needs to be secured before you leave a pool build site? (Doesn't matter which crew is onsite)

Construction fence

200

Who should you tag in photos at the end of your day?

Erica, Salesperson (people), Jess, and Vinny

200

As you are finishing up your phase of a project what should you do daily to ensure your site is kept clean.

Bring back any trash or extra material you do not need on site daily.

This will ensure you are not cleaning up a lot on your final day there.

200

Who was the Captain of the winning team of kickball last time we played as a company?

Jess

300

What is the name of the pool division?

Pronto

300

What do you have to do to receive your metric bonus every month?

Be at safety on time

300

What should you do to inform the next crew on a project about a detail that would go with their phase?

Tag them in a picture on sales force 

or 

send them a video with details.

300

Name the two brothers that appeared in the super bowl together?

Jason and Travis Kelce

400

What do you do if a machine is broken onsite? (2 part answer)

Take a picture and send it to Erica and Al

400

What two areas in salesforce could you list the materials you used for the day to keep the salesperson and the office in the loop on a job?

In the caption of a photo you uploaded or in the foreman notes

400

When finished with equipment onsite what should you do to get it removed from the property.

(2 Part)

1. Text Erica that the equipment is ready to be picked up.

2. Make sure the machines is close to the road with all attachments staged with it for the driver.

400

What three countries are hosting World  Cup 2026?

Canada, USA, and Mexico

500

Name all the designers/sales people for Disab?

Adrienne, Brian, Dave, Mehdi, Shawn, Grace, Ryan

500

What are the core values?

Efficiency 

Quality

United

Integrity

Passion

500

On a large build what could you do as a foreman to ensure you do not have a punch list at the end of the project?

Check in with the client, instead of waiting for the salesperson to check in with them.

500

How many years has DiSabatino been in business?

28