Safety
Quality
Cost
Productivity
WestRock Lancaster
100

Required clearance area for an electric panel

3 ft for under 250 volts and 4 ft for over 250 volts

100

Name & Location, ECT or Burst, and gross weight and size limits are required for this

Box Manufacturer's Certificate A.K.A. Cert Stamp

100
On a monthly basis this makes up 65% to 75% of the plants overall costs.

Paper

100

If the 100" EVOL (3124) lost out on 2,000 kicks worth of production, how long was it down?

5 minutes

2,000/400 = 5

100

Because of all the new equipment installed and the fact that they are in close proximity to our plant, what company has a vested interest in WestRock Lancaster's performance?

MHI

200

When loading/unloading a trailer using this safety device is a requirement

Glad Lock

200

How many times is a New Item checked before it is entered into the production schedule?

3 times, not including the checks done while building it

200
You peeled down a perfect roll and it resulted in 2 wraps of paper. Was the roll a liner or medium?

Medium

200

This process should take the 3133 EVOL 6 minutes

Set-up

200

We have 2 and each one is capable of 500 Horsepower.

Boilers 

300
The leading cause of work place injuries

Slips, trips, and falls

300

This customer has specific items that require a GREEN load tag

Kelloggs

300

What was WestRock Lancasters percentage of cost of non-quality product last fiscal year?

0.09%

300

If we were to only run 5 days a week the plant must produce how much per day in order to still hit the plants year end production goal

8 million MSF/Day

300

This department has 22 employees

Shipping

400

Safety Excellence is built on 4 key aspects. Performance, Prevention, and Process are 3 of the 4 P's, what is the number 1 aspect?

People

400

The last two major quality defects sent to P&G that required a problem solving board

Scratch on Pre-print & No Access Holes

400

A single shaft of these costs $2,800.00 dollars

EVOL Slotter Knives

400

If the Corrugator was running with a world class up-time percentage, what would be the top 2 causes of downtime?

Planned Downtime, Flute Changes

400

What is the plants numeric production goal for the entire year?

2 Billion MSF

500

What is the formula used to calculate RIR?

(# of injuries x 200,000 hours)/# of hours Worked

500

Good Manufacturing Practices, Pre-requisite Programs, Calibration Records, Preventative Maintenance Process, Sanitation Program, line clearance process, Quality Data, etc., etc. are all in scope and part of this

Safe Quality Foods Audit (SQF)

500

The number 1 cause of converting waste (22%) is what?

Jam-ups

500

After Stock Unavailable/No Stock, what is the 2nd leading cause of downtime on the Langston 360 3132 for the 1st quarter of this fiscal year?

Feed Section @ 42 hours and 25 minutes.

Pre-feeder will count for frequency 472 times.

500

In 2019, Amazon received how many trucks from WestRock Lancaster?

1,583