STEAM
Engineering Design Process
The 4Cs
Coding
Miscellaneous
100

What does the letter S stand for in STEAM? 

Science

100

In what step of the Engineering Design Process do we say who has the problem, what is the problem and why should we solve the problem? 

Ask

100

When we work together to reach a common goal it is called? 

Collaboration

100

True or False? A computer has its own brain and does not need a human at all? 

False

100

What do we call something we build to solve a problem? 

Prototype

200

In the acronym STEAM what does the letter T stand for? 

Technology

200

In what step of the Engineering Design Process do we see if our prototype works/solves the problem? 

Test

200

When we share toughts, questions, ideas, and solutions it is called? 

Communication

200

An error or problem in a program that prevents it from running correctly is called? 

A bug

200

Before we start building during a design challenge we think like an engineer. What 3 questions do we ask? 

Who has the problem, what is the problem, and why should we solve the problem. 

300

What does the letter E stand for in STEAM? 

Engineering
300

In what step do we brainstorm? 

Imagine

300

Inventing and trying new approaches to get things done is called? 

Creativity

300

A list of steps to finish a task is called? 

An algorithm

300

The paper booklet that we fill out when we are completing a design challenge using the engineering design process is called? 

The Design Brief

400

What does the letter A stand for in the acronym STEAM?

Art or The Arts

400

What is the name of the step in which we build our prototype? 

Create

400

Looking at problems in a new way is called? 

Critical Thinking

400

The name of the coding language that we used on Code.org is called? 

Blockly

400

The language that is used to give a computer instructions is called? (This tells the computer what to do)

Code

500

What does the letter M stand for in STEAM?

Math

500

The name of the step that we draw and label a diagram and/or write out the steps we need to follow to create our prototype is called? 

Plan

500

Creativity, Collaboration, Critical Thinking, and Communication are called? 

The 4Cs of 21st Century Skills

500

When we are dragging and dropping blocks of code we are writing code under the hood? True or False? 

True

500

The award that you can earn 1 time per month for the entire grade level is called? 

Engineer of the Month