Hazardous Energy
Utilities
Mobile Equipment
Toxic & Flammable
Working at Heights
Excavations
Confined Spaces
Lifting
Key Terms & Controls
Verification & Enforcement
100

The three energies behind hazardous energy work

Pressure, electrical, mechanical

100

Small holes dug to expose and confirm a utility’s location

Test pits

100

This must be working, and is checked as a critical control before equipment moves

Backup alarm

100

The two energies behind toxic and flammable work

Chemical and thermal (fire)

100

Height above a lower level that triggers fall protection

6 feet

100

Excavation depth that requires a protective system

5 feet

100

The only crews allowed to enter confined spaces

Qualified pipe crews

100

No one works or walks under this

A suspended load

100

What STKY stands for

Stuff That Kills You

100

The two people who verify critical controls before STKY work starts

The Foreman or the Competent Person

200

Fitted on air hoses to stop them whipping if a fitting lets go

Whip checks

200

Two locating technologies listed as engineering controls

Ground-penetrating radar and electromagnetic locating

200

The site logistics plan separates people from equipment with these

Designated haul roads and walkways

200

Cutting method used to avoid hot work entirely

Cold cutting

200

Fall protection is required at all times, at any height, in this equipment

A boom-supported aerial lift

200

The required slope ratio, horizontal to vertical

1.5 to 1 (34 degrees)

200

B&S never enters this kind of space

A permit-required confined space

200

Approved document every critical lift must have

A lift plan

200

The most effective level of the hierarchy of controls

Elimination

200

System where the Pre-Start Check is recorded

Raken

300

Blocking or cribbing raised components is this type of control

Direct Control (Engineering)

300

Hand tools required when working around utilities

Non-conductive hand tools

300

Remote-controlled trench rollers are this level of the hierarchy

Substitution

300

Required during flammable liquid transfer to prevent static sparks

Bonding and grounding

300

The crew must know these plans before working at heights

The fall protection and rescue plan

300

An excavation under 5 feet still needs protection when these persons see any potential for cave-in

The Foreman or Competent Person

300

No one ever enters a space for this reason

To perform a rescue

300

The qualified person who directs the crane operator

The signal person

300

The three tests every energy control must pass

Timely, tangible, targeted

300

What happens if neither a Direct Control nor an Alternative Control System can be confirmed

The work shall not start

400

Clothing required where electrical work is involved

Arc-rated clothing (and electrical PPE)

400

Goal posts or flagging at overhead lines count as these two Alternative categories

Physical obstacle and visual reminder

400

A spotter is required in these two situations

When visibility is impaired or when working near other trades

400

Monitored during lime spreading

Wind

400

A personal fall arrest system only counts as Direct when these two conditions are met

Properly anchored, with fall clearance verified

400

Not permitted on B&S sites because all soil is treated as Type C

Benching

400

The two classifications that allow entry

Non-permit, or approved for alternate procedures

400

Governing policy for cranes and critical lifts

2.8 Cranes and Critical Lifts

400

Minimum makeup of an Alternative Control System

At least two controls from at least two different categories

400

First action when a Safety Absolute is violated

Stop the work and remove the person from the task

500

Name the two governing policies for hazardous energy

2.24 Control of Hazardous Energy and 2.28 Pneumatic and Hydrostatic Testing

500

Having the owner de-energize, deactivate, or relocate a conflicting utility is this level and type of control

Elimination (Direct)

500

Name the two governing policies for mobile equipment

2.16 Mobile Equipment and 2.17 Heavy Equipment Spotter

500

Name the three governing policies for toxic and flammable work

2.9 Hazard Communication, 2.12 Fire and Hot Work, 2.22 Silica

500

Name the two governing policies for working at heights

2.19 Fall Protection and 2.21 Stairways, Ladders and Scaffolds

500

The Competent Person inspects the excavation at these three times

Before each shift, after rain, and after any event that could change conditions

500

Rescue coordination with the fire department or a rescue company is required for these two entry types

Alternate procedures entries, and horizontal entries without a retrieval method

500

The three things a critical lift needs before it proceeds

An approved lift plan, a qualified rigger, and a qualified signal person

500

The three Alternative Control System categories

Physical obstacle, dedicated monitoring, visual reminder

500

The two outcomes the violation review decides between

Willful violation or system failure