Software
Equipment
Work Packets/Steps
100

When initializing what should the Tscope NB be adjusted to as a lower limit?

45

100

What type of coolant is in the CEU?

Ethylene Glycol

100

What are the Equipment conditions for Transition down to STBR?

Power up Radar, Transition up to LOR

200

What is the upper limit value for Tscope Noise Data MBN when initializing the Radar?

65

200

What is the prime power of the AEU?

4160VAC, 3-Phase, 60HZ

200

What are the equipment conditions for Transition up to STBR?

Power up Radar, Transition to STBNR

300

What is the min number of sat's required for system performance assessment?

5

300

When conducting Power Up PPU, the boot process for the Programmable Logic Controller take approximately how many minutes?

2 minutes

300

What tool is required for Unexpected Power Loss of 4160(on UPS)- Radar Restart?

Flashlight

400

What is the first step of Enable RF?

Conduct a visual inspection of the denied occupancy area. Relocate any units or personnel

400

Each SAM has how many T/RIMMs?

44

400

What is WP 0331?

Radar System Initialization: Mission Setup

500

When the time in Digisim operations active exceeds the max scenario length of _______ seconds, radar operations should ignore SPS/REX/BSG communications error

7200 seconds

500

What is the normal operating temperature range of the PPU?

-10c to 30c or 14f to 86f

500

What WP would you reference for KCS Utility/Generator Power UP?

WP 0184