200

Something KN 899 tells the contractor to do in case there are existing conduits in the way of the new GPU cooler/freezer.

What is X-Ray?

200

The maximum number of heads to put on a track circuit.

What is 90?

200

The breaker size for a 208V/1, 7 amp GPU walk-in freezer evap coil.

What is 20 amps?

200

This is the Target load type abbreviation that would be used for a circulation pump feeding the Starbucks area.

What is "MN"?

200

Featured in Target article for T-2165, I am the person you coordinate if you can't figure out where the canopy conduits go on Target stores.

Who is Tim Haag?

400

A type of existing market lighting system that gets removed for Pbase stores and replaced with a luxbeam system.

What is a BUSStrut?

400

This is the track connector symbol used for joining 2 track pieces making a 90 degree angle with a homerun connection.

What is "Z"?

400

The lowest standard amperage rating for a disconnect switch.

What is 30 amps?

400

Equipment that should be included and powered with split systems. 

What is AC Controller?
400

This reference determines if you have EAS/baler/compactor/submetering scope (not the scope checklist). Also used for 'age & condition' items.

What is the CBAR?

600

DAILY DOUBLE!!!!

Relocating me is acceptable, but coordination is a must. 

600

The distance covered by a 45-degree angled Wattstopper HB300-L1-B occupancy sensor.

What is 43'-0"?

600

This code section requires to add a receptacle within' 25 conductor feet for HVAR equipment such as new roof top unit or condensing unit.

What is 210.63?

600

The highest rating for Square D 2-pole and 3-pole GFCI breakers.

What is 10,000AIC?

600

This is the cubic feet per meter threshold for adding a duct smoke detector for a new RTU.

What is 2000 CFM?

800

A very valuable graphical aid we use in our designs to help visually see the scopes.

What is an overlay?

800

A fixture who's mounting height must be updated if the sales floor is over 14'-0" AFF.

What is VL12?

800

A common scope for 2023 recently trained on that uses all the colors of the rainbow in the criteria, should be done early, and ideally reviewed internally and externally prior to permit.

What is Optical 3.0?

800

This is the coil voltage for a relay controlling a new LP-6A with an integral contactor on the main bus.

What is 120V?

800

This is where a typical GPU walk-in elec defrost load is fed from.

What is a condensing unit?

1000

A design guide where demo plans are considered something to do early.

What is electrical work flow?

1000

The type of lighting device that is used for a 10' x 10' office for a store in California with new lighting.

What is an combination occupancy sensor/dimmer switch (or PW-311)?

1000

Often required on project, this piece of equipment may be used when utility is deemed reliable and requires significant lead time and coordination.

What is electric fire pump?

1000

Switzerland, a new game releasing this year in September, or the 'absent' conductor of "3W" under the feeder tags for RTUs on Target one-lines.

What is neutral (or grounded)?

1000

DAILY DOUBLE!!!!!

An article in the NEC that keeps you exempt from from multi-level controls in California for Clinic exam rooms.