What is Air Defense Warning Red:
Attack by hostile aircraft or missile imminent or inprogress
300m
What does PDISE stand for?
No Battlespace
Negate
Launcher Back Blast Area Hazard
300 Meters
What is Weapon Control Status Hold
What are the 5 engagement Subplans?
LOT, Catch All, Engage, Engage Now, WMD
Nomenclature of the Generator used to power the TOS/LCS
AN/MJQ40B
Browning
Low Missile Procedures (LOMO)
Keep out zone of the Radar for Personnel
500 Meters
What does SAMSTATREP Stand for?
Surface To Air Missile Status Report
Name 4 Base Strategies when planning:
Min Radar Resources, Max Battlespace, Max Assets by Value, Max Assets Covered, Max Trajectories by Value, Max Trajectories Covered, Max Active TBM NAI by Value, Max Active TBM NAI Covered
What are your TTL/TTLC?
Time till Launch/Time till last commit
SICK
System degraded
Effective 12 July 2020 at 2000Z. Write in proper DTG Format according to a STO.
122000Z062020
Name the 3 ways to find your Estimated Launch Point
TBM is being passed and processed by LTDA.
SKIP
381 Meters/1250 Feet
Name/List all TBM Distaces
What will show under the AUTH section of your Engagement que when the Launcher has received the EP&S (Engagement Planning & Scheduling) message?
ASSIGNED
TBM has passed through a defensive layer
Leaker