Steel
TSA
Process Map
Grab Bag
Our Team
100

A36 Steel is characterized by having a yield stress equal to this.

What is 36 ksi?

100

This TSA submittal phase of the 5 is used to characterize design alternatives and ultimately choose one of the designs.

What is Pre-Design? OR the alternative analysis report?

100
Name the two process map deliverables which two of your year end goals are directly tied to.

What are specifications and conveyor list?

100

Name one of the primary tools used to fabricate US Raw equipment at VIM.

What is Laser Cutter, CNC Bender, Welder, Paint Booth?

100

This person came from the nuclear industry and is a power tool enthusiast.

Who is Ben Barnett?

200

This type of conveyor finish would be applicable and useful for outdoor conveyors. 

What is galvanized steel?

200

What does PGDS stand for?

Planning Guidelines and Design Standards

200

Name 3 of the Process Map MPE Responsible Deliverables.

Mechanical Baseline (PD5), Item Request ME, Installation Instructions, Conveyor Stickers, Conveyor List, Procurement Specifications , Mechanical Running Test Plan (MRT), Mechanical Equipment Specifications, Mechanical Component Specification, Drawing Authorisation Request (DAR), Commissioning Spare Parts list ME, Installation Spare Parts ME

200

This is the motto of Salt Lake City's new airport.

What is seismically safe?

200

This team member had a new baby this year.

Who is Josh Bello?

300

Daily Double!! 

Our sideguards are made of this type of steel.

What is "Sheet 12 GA steel HRPO ASTM A1011 CS type B, 34ksi min Yield, LASER"?

300

The idealized capacity of a CTX 9800 in the medium inline throughput configuration is 709 bags per hour. The capacity used for design is based on this percentage of the idealized capacity.

What is 95%?

300

Process map contains links to many tools and templates. Though these links live on the process map Vikipedia pages, these documents actually reside in this repository. 

What is Enovia?

300

Based on historical data, the USGS has grouped the country in to 4 main seismic zones which are called this.

What are zones 1, 2, 3, 4?

300

This person is most likely to have a "trivia question of the week" posted as their teams status.

Who is Chris McKay?

400

This was the first inexpensive industrial process for the mass production of steel from molten pig iron before the development of the open hearth furnace.

What is the Bessemer process?

400

According to PGDS section 14.2, the optimal CBRA layout for a large baggage system would use queues in the CBRA measuring this length.

What is 4 feet?

400

This is the US owner of the process map.

Who is Matt Dubois?

400

This type of soil failure in seismically active zones must be considered when designing building foundations.

What is liquefaction?

400

This many people have joined our team in the past 4 years (not counting EPMs)

What is 8?

500

Up until 1985 in versions 1-9 of the AISC Steel Manual, the design philosophy used was allowable stress design. In 1986, AISC issued its first edition of this new design philosophy.

What is load and resistance factor design (LRFD)?

500

Prior to the entrance to the EDS machine, it is a requirement to provide a specific type of control station that allows a TSO to test the EDS machine before each operational day. This control station is called an OTK control station which stands for this.

What is Operational Test Kit?

500

Name the 5 areas of the project according to process map that apply to our group.

What is Define, Detail, Supply, Install, Commission?

500

The simplest form of an aircraft engine is called the ram jet. There are two other types of engines used in modern aircraft. One is the turbo prop, the other is this. 

What is the turbo fan?

500

This well respected MPE has appeared on a popular game show.

Who is Ben Jackson?