As-Built Package Standards
Prevailing Wage & BABA
Job Cancellation Policy
Subsidy Compliance
Nothing to do with work
100

This is the deadline, in calendar days, for a BP to upload the complete As‑Built Package after construction milestone completion.

What is 15 days? 

100

This requirement ensures that labor rates for construction meet specific state‑mandated thresholds.

What is Prevailing Wage?

100

This P2 status is applied first when a job is being prepared for cancellation.

What is Pending Cancel?

100

These passings are government‑funded and based on a negotiated grant contract.

What are subsidy passings?

100

This snack was invented by accident when a chef, annoyed by a customer, sliced potatoes too thin and over‑fried them.

What are potato chips?

200

All deviations from design on an As‑Built map must be marked in this color.

What is blue?

200

Design teams must ensure that the Bill of Materials uses only these materials when the BABA flag is present.

What are BABA‑approved materials?

200

This task is sent to the Construction BP to document what work was completed in the field.

What is the Submit As‑Built Package task?

200

This type of passing, that can be served along the planned route with minimal additional work, must always stay inside the Subsidy project because it can be served without creating a separate PUB, even though it’s not part of the negotiated contract.

What are Along the Way passings?

200

This condiment was once sold as a medicine in the 1800s before becoming a burger staple.

What is ketchup?

300

These maps show exact field conditions after construction, including deviations, equipment, and passings.

What are As‑Built maps?

300

Construction teams must validate that labor rates meet these requirements when a PW flag is present.

What are prevailing wage requirements?

300

This person determines if materials need to be recaptured to the warehouse.

Who is the job owner?

300

These passings require additional Comcast‑funded construction and must be in a separate project/CAR.

What are Bolt‑On passings?

300

This animal is the only one known to sleep standing up and sometimes snore loud enough to scare itself awake.

What is a horse?

400

This required file captures aerial, underground, coax, fiber, new, and existing footage data for an As‑Built submission.

What is the Footage and Passing CSV?

400

These mandatory checkboxes identify federal labor and material requirements at project creation.

What are the PW and BABA fields?

400

A job should only be fully canceled when these financial items have been completed or updated.

What is all invoicing?

400

This project type is used when Comcast fully funds all expansion work, including bolt‑ons.

What is Strategic Edge Out?

400

This Disney character has only four fingers on each hand, a tradition started to save animation time.

Who is Mickey Mouse?

500

This sheet documents every fiber connection and must include OTDR results and enclosure photos.

What is the As‑Built Fiber Splicing Sheet?

500

This team verifies BABA compliance by confirming maps and BOMs reflect only U.S.‑produced materials.

Who are Design Teams?

500

This job‑level update ensures maps do not include drafted routes that were never built, preventing future designs from using incorrect data.

What is the Cancel: Revert Design map update?

500

This project type is used when Comcast has a government‑approved grant, with or without funding.

What is the Subsidy project type?

500

This word describes fear of long words, despite being one of the longest words itself.

What is hippopotomonstrosesquippedaliophobia?