Name Changes
Feature States
PI Planning
Compare and Contrast
Random
100

Scrum

What is Daily Stand-Up?

100

This gets the state of New.

What is the Feature is not ready for team review?

100

This is now called PI Planning

What is Big Room Planning?

100

This is something Backlog Grooming and Iteration Planning have in common.

What is they are both 2 - 4 hours per iteration?

Or

What is the whole team is involved?

Or 

???

100
This is Value Tracking

What is the spaghetti looking chart we used in Iteration 2 and 3? 

200

This is now called an Iteration

What is a Sprint?

200

Team has the feature broken up into defined user stories

What is Decomposed?

200

This is the level of the Work being done during PI Planning

What is the Feature/Story Level?

200

Releases vs Planning Increments

What is Releases are scheduled pushes to production and Planning Increments are plans for a set of Iterations. 

300

These were once called Team Leads

What are Directors?

300

This is Accepted

What is all user stories on a feature are accepted?

300

This is the duration

What is 2 days?

300

How we use to do Backlog Grooming vs how we do it now.

Discuss

400

Iteration Planning

What was Sprint Planning?

400

This state means that the PO/Team have reviewed the feature and agreed on the description, acceptance criteria, and t-shirt size

What is Groomed?

400

This is what we need to have at the before PI Planning starts

What are Features prioritized and Features marked as "Groomed"?

400

Static vs Dynamic

What is staying the same vs changing?

500

Formerly known as Testers

What are team members?

500

This state means all user stories on this feature are in an integration/regression environment.

What is Release Candidate?

500

DOUBLE JEOPARDY!








These are the 7 Exit Criteria for PI Planning (must be completed by the end of PI Planning)


  • Feature Story and Acceptance Criteria is finalized

  • Feature decomposed into Stories

  • Stories have been assigned points

  • Feature Preliminary Estimates align to Points

  • Features and Stories are roughly sequenced by iterations to determine dependencies and compare against iteration capacities 

  • Features are marked as “Decomposed”

  • Features to be planned in PI have concurrence from the Team and PO(s)