Florida Building Code
Permit Lingo
Know Your Jurisdictions
Submittal Shenanigans
100

When replacing windows in a home, this extra feature might be required if the window is located in a bedroom.

What is an egress window (emergency escape and rescue opening)

100

This is the official approval you get from a building department that allows construction to begin. 

What is a permit?

100

This jurisdiction on Florida's East Coast (sometimes referred to as the "Fun Coast") hates when you leave owner's names off of Notice of Commencements.

What is Volusia County

100

Don't forget to submit this form after recording to allow for inspections to be called in.

What is the Notice of Commencement

200

This label, usually found on the frame, shows that a window meets testing standards and design pressures.

What is a product approval or NOA label? (Will also accept NFRC label)

200

This fee is charged when a final inspection fails. 

What is a reinspection fee?

200

This building department will issue your permit instantly, but only if you have an active escrow account.

What is Hernando County Building Department

200

When submitting a permit for new or replacement windows, this document must be included to show compliance with the Florida Building Code requirements.

What is a Florida Product Approval or NOA?

300

This type of glass is required in windows if they are considered to be in a hazardous location as listed in FBC R308.4.3 

What is Tempered Glass

300

This is the term for changes made to plans after a permit has already been issued. 

What is a revision?

300

The City of Kissimmee requires this affidavit be submitted prior to issuing a permit. 

What is the Contractor's Affidavit of Responsibility?

300

Some building departments require these ratings, which are typically found on the VOS Quote, but others don't.

What is the SHGC and U-factor?

400

Only three Florida counties fall into this special classification, which requires buildings and windows to meet higher wind and impact standards.

What is the High Velocity Hurricane Zone (HVHZ)?

400

The area or region where impact glass or storm protection is required.

What is the Windborne Debris Region (WBDR)

400

Although everything is submitted online, these 2 Central Florida building departments still require payments to be made in person with cash or check - no credit cards allowed.

What is the City of Winter Garden and the City of Minneola?

400

Many Central Florida Building Departments utilize this system for plan review, which allows the user to complete tasks and upload documents.

What is Project Dox?

500

Even a hurricane-rated window can fail if this part of the installation isn’t done correctly — it seals the window to the wall and keeps water out.

What is Flashing?

500

These glass enclosed rooms are common in Florida. This category means the room is not insulated nor is it livable space.

What is Category II Sunroom?

500

In addition to the application, this Central Florida building department requires you to submit proof of insurance with every permit request.

What is the City of Oviedo?

500

The city of Jacksonville requires this for any commercial project, regardless of value. You may be able to get an exemption, but you'll have to provide the calculations. 

What is an asbestos survey?