Feasibility Study
Design and Planning
Cost Estimation
Scheduling
Construction
100

To build a housing development in Boone, who is typically responsible for building sidewalk/s?

Project General Contractors 

100

The project design team suggests placing the solar panels like a parking shade, what LEED score they can claim for 

Heat Island Effect 

100

What building division will be calculated in the indirect cost?

General Requirements

100

What animal sleeps %90 of its life?

Koala bear

100

Who would request a change order?

Owner

200

How many hearts does an octopus have? 

three

200

What is the maximum width of the modular boxes for road transportation without any oversize permit fee?

[on the east coast]

16 feet

200

According to your project cash flow in which month in your project you had the highest cost estimation?

XX

200

How many waiting days are recommended by civil engineers for concrete curing before the installation of modular boxes on the top of the foundation?

28 days 

200

This country has no mosquito 

Icland

300

What source you can use to determine the Building Permit for your project in the feasibility phase?

Schedule of Permits/ Permit Schedule by Planning and Inspection Department

300

The lumber size for the ceiling joists for the volumetric modular boxes can be as low as BLANK

2 x6

300

Which one is the most profitable markup indirect percentage rate?

35       45         25

45

300

What percentage (in range) of a conventional project schedule you may reduce by offsite techniques 

20 to 60

300

What is the main reason to write the Ethical Dilemma to the Owner?

Provide in the written document stating that they are faithful to the agreement's terms and conditions

400

Front door and back door analyses are useful to determine BLANK and BLANK respectively

How much of income you need to generate

How much of the building cost you can afford 

400

Adding bicycle racks to the project design will help with what category in LEED 

Location and Transportation

400

Name two sets of data in the Cash Flow diagram

Monthly Cost 

Cumulative Cost

400

What activities can be executed on-site while the modular units are being constructed in the factory? 

Site preparation 

Foundation 



400

Final Payment is equal to BLANK and is being paid after BLANK 

Retainage 

Completion

500

Housing and Urban Development (HUD) recently provided a policy where the single-family R1 lots with an existing ADU can be qualified for FHA by adding equity to their loan application. How does that help in getting a construction loan for your project? 

Unfortunately, that is only for FHA single-family and does not apply to multi-family projects. 
500

Name four requirements to place in the site utilization plan

Safety box  Fences  Lot boundary/line  Parkings  Loading area etc 


500

In a modular design build project, what cost item can comes with savings 

Savings :number of days for renting euqipments on site for example renting GC trailer for General Condition/Requirements 


500

In the Line of Credit Graph which of the graphs shows a higher value 

Cumulative Cost OR Cumulative Payment 

Cumulative Cost

500

Any day receiving BLANK of rain or greater is classified as a weather delay day.

0.5 inches