When does it apply?
You have Broken Da Law
What is Da Law?
Wait there are more Laws?!
Setpoints of Da Law
100

What happens if a surveillance fails?

SR 3.0.1 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY,
Failure to meet a Surveillance, whether such failure is experienced during the performance of the Surveillance or between performances of the Surveillance, shall be failure to meet the LCO.

100

You are in the middle of moving the 33rd irradiated fuel rod this outage. Red and White inverters fail out and lose power. 

N-31 and N-32 no longer work so you dont have 2 operable SR channels and you do not have 1 SR Audible. 

Immediately initiate action to restore one source range neutron flux monitor to operable status. (2 non-operable)

Immediately initiate action to isolate unborated water sources

(Audible Count)

100

LCO 3.4.5

RCS Loops, Mode 3

2 RCS loops shall be operable with one in operation

100

Control rod worth shall be identified in these modes

Mode 1 and Mode 2 > 2% RTP

100

Water level when moving irradiated fuel in containments

>/= 23 ft above top of vessel ledge plate thing... AT OR ABOVE

200

You are currently in a TSAC for RHR loop inoperable due to RHR pump failure, when loop is required to be operable. Maintenance has informed you that pump repairs are complete, and ready for testing. What happens to the clock during retest of the pump, and why?

Clock is stopped when equipment is considered operable

LCO 3.0.5 Equipment removed from service or declared inoperable to comply with ACTIONS may be operated under administrative control solely to perform testing required to demonstrate its OPERABILITY or the OPERABILITY of other equipment. This is an exception to LCO 3.0.2 for the system operated under administrative control to perform the testing required to demonstrate OPERABILITY.

LCO 3.0.2
If the LCO is met or is no longer applicable prior to expiration of the specified Completion Time(s), completion of the Required Action(s) is not required unless otherwise stated.

200

Containment has been declared inoperable.

Restore containment to operable status within 1 hour

200
The note of LCO 3.5.3 states what

LCO 3.5.3 One ECCS train shall be OPERABLE.
- NOTE: An RHR train may be considered OPERABLE during alignment and operation for decay heat removal, if capable of being manually realigned to the ECCS mode of operation.
ACTIONS
- NOTE: LCO 3.0.4.b is not applicable to ECCS high head subsystem.

200

TLCO 3.2.1

A minimum of how many thimbles are required

Correct answer is 8 or 2 per quadrant

200

A Primary Safety Valve lift setpoint.

2485 psig (+/- 3%)

After initial calibration must be within +/-1%

300

What is the generic definition of the term "Operable" in regards to tech specs?

A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified safety function(s)  and when all necessary attendant instrumentation, controls, normal or emergency power, cooling and seal water, lubrication, and other auxiliary equipment that are required or the SSC to perform its specified safety function(s) are also capable of performing their related support functions.

300

You are in Mode 5 with Pressurizer level at 27 inches. SG A and B have been drained for radiography testing of vessel integrity. RHR Pump A has tripped due to grounds. 

Initiate action to restore a second RHR loop to operable status 

OR

Initiate action to restore SGWL to >35%

300

Reactor is at 4% RTP

NR-32 has been declared inoperable

3.3.1

2 IRNI or 1 SRNI inoperable-suspend operations involving positive reactivity additions immediately

300

The squirtle squad is taking suction directly off the pump bay and discharging at 9000 gpm. CCW flow is currently at 8000 gpm.

TLCO 3.7.7 delcare Containment fan coolers inoperable when pump bay level is <-11.5 ft, and G-01 and G-02 inoperable at -15 feet

Also CCW max flow for 2 pumps is 7862 gpm

300

The 3 setpoints of LCO 2.2

DNBR <1.17

Peak Fuel Centerline Temp. <5080F and then 58F increments

Pressure <2735 psig

400

Per LCO 3.4.7, when may an RHR loop be inoperable for 2 hours?

3.4 REACTOR COOLANT SYSTEM (RCS)
3.4.7 RCS Loops—MODE 5, Loops Filled, What does the Above the Line Note Mean?

NOTE:
2. One required RHR loop may be inoperable for up to 2 hours for surveillance testing provided that the other RHR loop is OPERABLE and in operation.

400

Tave is 186F

D-05 has been declared inoperable by pilot cell voltage.

3.8.5, 3.8.6, 3.8.7

Declare affected required features inoperable AND initiate actions to restore - immediately 

Verify pilot cells electrolyte and voltage meet category C requirements in table - 1 hour

Declare affected required features inop and initiate action to restore - immediately

400

3.7.13 modes of applicability

Modes 1-4

(I-131 shall be less than or equal to 0.1 microCuries per gram)

400

What TLCO states you must have 2 Rx Vessel head vent paths, and what are they? 

PRT and Containment Atmospher

TLCO 3.4.4

400

Accumulator is operable when...

1100-1136 cu.ft (6-49%)

700-800# (Nitrojan type air)

2700-3100ppm (Beau-Ron)

500

You are at 12% RTP, rising in power following physics testing. During the rise of power a faulty instrument with the CVCS systems starts borating without prompt. The CO forgot his morning coffee and is slow to respond while the OS was picking which kringle he wanted. Rx power is now in the intermediate range when boration was secured. The other OS returning from the head when he realized that IRPI is no longer functioning. Is LCO 3.1.7 met?

Good discussion overall but going for not applicable, youre in mode 3 now or whatever.

500

Tave is 212F

1A06 was tagged out due to ground

2X04 gets a lockout, DG-02 fails to start

MDAFW

Initiate actions to restore MDAFW immediately

500

Service is considered operable with...

6 operable pumps

Ring header continuous flow path uninterrupted

Non-essential load isolation valves operable or isolated

Opposite unit 2907/2908 shut

Modes 1-4

500

You are performing refueling on Unit 1 in Mode 6. RP contacts you and says that "se-- radio--- ---es" (in some sort of weird chemistry klingon) is at 105 microcuries. What are the actions and time requirements of TLCO 3.7.4?

Withdraw sealed source from use, decon, and repair or dispose IAW Commsion Regulations - Immediately.

500

Battery Cell operation setpoints before you call the battery inoperable for a connected cell.

<60 F

>2.07 V Float Voltage

< 0.020 specific gravity of all connected cells and average of all connected cells >/= 1.195


Above top of plates, and not overflowing