Construction Quality Management
Plans and Specs
Project Administration
Inspection Plans
Random
100

This is the purpose of the CQM program is to achieve the quality establish by what.

What the contract requirements?

100

This type of drawing provides information to manufacture a machine part or erect a structure.

What is working?

100

Military construction (MILCON) is programmed for funding via this published document.

What is Project Objective Memorandum (POM)?

100

This is the number of calendar days the construction unit has to notify the QA authority if any changes are made to the QC plan.

What is 7 days?

100

This is a goal set during the pre-planning conference.

What is identify assumptions and limitations? 

200

The QC Manager implements and manages the QC System and is directly responsible to whom.

Who is the commanding officer?

200

This type of plan shows contours, boundaries, roads, utilities, trees, structures, references, and any other significant physical features. 

What is Site Plan?

200

These individuals conducts the constructability review for each assigned project.

Who is Project/Construction managers?

200

This document clearly delineates the function and responsibilities of the team members.

What is project quality assurance plan?

200

This individual conducts a pre-planning conference with the project team to set goals for accomplishing the planning tasks.

Who is the Project Manager?

300

When it comes to noncompliance, the primary focus of the QC System is what. 

What is prevention?

300

This is the location where the revision block will appear on the blueprints. 

What is upper right corner?

300

These are the two broad categories of task organization the Naval Construction Force(NCF) uses for mission accomplishments.

What is general engineering and defensive operations and tactics?

300

This organization performs the QA function when supporting Navy installations.

Who is Facilities engineering and acquisition divison (FEAD)?

300

This element is responsible for the quality, safety, and timeliness of the construction effort and for directing the support elements. 

What is the Lead element?

400

This is known as the backbone of the QC System.

What is the Three Phases of Control?

400

This type of drawing reflects minor changes or field adjustments made to official contract drawings while in the field during construction.

What is Red-line drawings?

400

Seabee project managers need to be familiar with funding appropriations as it relates to what two items.

What is project funding threshold/timing limits?

400

These individuals prepare an individual project safety plan and submits it to the Safety Officer for review and approval prior to work starting on the project. 

Who is project supervisor and crew leaders?

400

This individual is responsible for conduction the periodic Quality Control meetings.

Who is the Unit Quality Control Manager?

500

This document is developed by the designer and maintained by the project crew leader, list all required material submittals.

What is project submittal register?

500

This document is used to supplement the drawings when an aspect of construction cannot be shown graphically.

What is Specifications?

500

This document is used to record conditions and decisions reached between to NCF units. 

What is Turnover Memorandum Worksheet? 

500

This document must be included in the project safety plan.

What is List of definable features of work (DFOW)?

500

This phase(s) of the Three Phases of Control involve(s) reviewing the safety plan.

What is the Initial Phase?