100

What two countries are connected by the Channel Tunnel?

The United Kingdom and France.

100

What year did the construction works of the Channel Tunnel start?

1988

100

What do they use to travel through the tunnel?

high-speed passenger trains

100

What did they use to dig the Channel Tunnel?

Tunnel boring machines

200

What are the two towns that are connected with the Channel Tunnel?

Folkestone and Coquelles.

200

What is the Channel Tunnel´s deepest point (below the sea level)?

115 meters

200

What is the speed limit for the trains travelling through the Channel Tunnel (kilometers per hour)?

160 km/h

200

What kind of occasional mechanical problems has the Channel Tunnel faced?

Fires and cold weather, geological/geographical and financial issues 

300

What company owns and operates the Channel Tunnel?

Getlink

300

How much did the channel Tunnel cost to build?

£9 billion (equivalent to £21.8 billion in 2021)

300

How long does it take to travel from France to the UK or vice versa via the Channel Tunnel?

35 minutes

300

What year did cross-tunnel passenger traffic volumes peak?

In 1998

400

How many kilometers long is the Channel Tunnel?

50,46 kilometers

400

How many people were employed at the peak of the Channel tunnel´s construction?

15 000 people

400

In 2023, how many passengers travelled through the Channel Tunnel?

more than 10.7 million passengers

400

How many tunnel boring machines did they use?

eleven

500

What year was the Channel Tunnel opened?

1994

500

What was the daily expenditure at the peak of the Channel Tunnel´s construction?

over £3 million

500

On average how many trains run through the Channel Tunnel each day?

350

500

How many fires have been in the Channel Tunnel?

three