Dimensions
LCM
THD Standards
THD - CAD
Steel & Racking
100

True or False. Always use OSNAP's when adding dimensions to a plan?

True

100

What does the green dot indicate for the Live or WIP plan status?

Plan available to be checked out

100

Which side of the aisle has EVEN sequencing, and which side has ODD sequencing?

Left side - EVEN

Right side - ODD

100

When using the "colorize" tool, what is indicated by yellow hatching?

Remerchandised, relocated, decreased or changing of any Plan/POG title

100

How many rack states are there?

5

200

What is the min. distance off steel 96" or higher for laydowns?

5'-0"

200

When a Live or WIP plan is checked in, can the file name be different from the file name that was checked out? (Yes/ No)

No

200

What layer should the base plan always be on?

H-XREF

200

What tool/button assigns the MLX project number to the scope line?

Attribute Scope Line

200

What does the rack state "D" stand for?

Damaged

300

True or False. If you see a dimension measuring to something (inside a bay), you should delete it.

True

300

What does LCM stand for (in Store Planning)?

Life Cycle Management

300

What is the standard flu space behind an endcap?

3"

300

What color is used to represent decreasing plan/POG title (colored bubble), and what does the bubble show?

Red; the number of bays that have been reduced from a product category

300

What does ARU stand for?

Abuse Resistant Upright

400

True or False. You must use a running string of dimensions along Racetracks 1, 3 and the Back Wall.

False. The running strings of dimension are along RT1 and the BW. RT3 does not use a continuous string of dimensions.

400

In which of the tabs of LCM would a planner go to enter a single store number to Check OUT a copy of the WIP plan of that store?

Store Level View

400

Can the POG Assignment tool assign a POG Title to multiple bays at one time? (Yes/ No)

Yes

400

What are the 4 colors we use to hatch bays?

Green, Yellow, Mauve, Cyan

400

When adding NEW steel, what are the minimum thresholds required for ARU uprights?

42" depth and 96" height

500

What should the width of a racetrack laydown be?

4'-0"

500

How many Plan Status options are there?

8

500

DAILY DOUBLE!!!

If power is a fixture trait added to a bay, what symbol is used to represent it on the plan? 

If lighting is a fixture trait added to a bay, what symbol is used to represent it on the plan?

Power fixture - Lightning bolt

Lighting fixture - Light bulb

500

Select up to ___ POGs to assign to a single bay?

4

500

How many DEPTH, HEIGHT, & LENGTH options are available when changing steel?

Depth - 6

Height - 12

Length - 9