The Preferred Nomenclature Is...
You're Out of Your Element
Random Caveat
100

Types of drawing files that are the most acceptable (and preferred) for quick and accurate space planning

What are CAD files or an Original PDF 

100

The minimum number of outlets required per workstation

What is one

100

Where can you find up to date inventory

Vari: V Drive > Employee Resources > Product Info
200

Renderings requiring a managers approval and a turnaround time of 96+ hours

What are Environmental Renderings

200

A form that should be included in every project to call out pertinent details such as ceiling height, furniture specifics, etc.

What is the Project Brief

200

The most popular QuickFlex Wall Finish Type

What is Clear/Frost

300

All renderings requiring a managers approval

“Whitebox”/3D Rendering – 72+ Hours 

“Whitebox”/3D Overall – 72+ Hours 

Environmental Rendering – 96+ Hours

300

Three Ways you can locate a CAD if they do not know where it is

What is:

Leasing/ Property Management

A&D Firm

Property Owner

Building Engineer 


300

Our product solution for power distribution and wire management

What is QuickFlex Power Beams

400

The portion of the Project Brief summarizing client goals and expectations

What is Project Scope

400

A way of linking power that is NOT recommended for ProDesk

What is daisy-chained

400

The average $ per Sq Ft last year

What is $22

500

A civil rights law that prohibits discrimination based on disability.

What is the Americans with Disabilities Act (ADA)

500

A plan provided by your designer suggesting where new power should be placed

What is a 'Recommended Electrical Plan' or 'Power Location Plan'

500

Minimum ceiling height required for Quick Flex Walls

What is 9'H