MIXING
EXTRUDING & CALENDERING
CUTTING
BEADS & BUILDING
CURING & FINISHING
100

LIKE A CAKE, RAW RUBBER, POLYMERS, CHEMICAL AND FILLER INGREDIENTS ARE LISTED HERE, IN SPECIFIC PROPORTIONS

WHAT IS A RECIPE

100

THE FORCE IS WITH YOU IN THIS SECOND STAGE OF THE TIRE BUILDING PROCESS 

WHAT IS EXTRUDING

100

TIRE BUILDERS AND CUTTERS USE THIS HEATED TOOL TO CUT COMPONENTS

WHAT IS A HOT KNIFE

100

THIS 6TH STAGE OF TIRE MANUFACTURING IS WHEN ALL THE COMPONENTS COME TOGETHER

WHAT IS TIRE BUILDING

100

IT'S THE SEVENTH STAGE IN TIRE MANUFACTURING, ALSO KNOWN AS VULCANIZATION

WHAT IS CURING

200

SOUNDING MORE LIKE AN ENGLISH VILLAGE THAN A MACHINE, RUBBER COMPOUNDS ARE MIXED INTO THIS

WHAT IS A BANBURY

200

LAYERING FABRIC OR STEEL BETWEEN RUBBER AND PRESSING INTO SHEETS. IT IS THE THIRD STAGE OF TIRE MANUFACTURING

WHAT IS CALENDERING

200

A COMPONENT THAT IS CUT TO SPEC. AND PLACED INTO A BOOK OR CAN 

WHAT ARE TREADS

200

NO BEATING IS REQUIRED FOR THIS INSTRUMENT ON A TIRE BUILDING MACHINE. OPERATORS  WILL FEED EACH COMPONENT AROUND THIS TO BUILD EACH TIRE.   

WHAT IS A DRUM

200

NO NEED TO ADD ONIONS & POTATOES WHEN DROPPING A GREEN TIRE INTO THIS TO CURE

WHAT IS A POT

300

SAFETY BEGINS KNOWING WHERE THESE SAFETY DEVICES ARE LOCATED ON EVERY MACHINE 

WHAT ARE E-STOPS

300

PUSHING COMPOUND RUBBER THROUGH A DIE INTO VARIOUS SHAPES CREATING TREADS, SIDEWALL AND BEAD FILLERS FOR A TIRE IS KNOWN AS THIS 

WHAT ARE COMPONENTS

300

LIKE EDITING A FILM, COMPONENTS ARE CUT AND THIS PROCESS BINDS THEM TOGETHER

WHAT IS SPLICING

300

STAGE FIVE ON THE TIRE BUILDING JOURNEY PRODUCES THIS RING OF HIGH TENSILE STEEL THAT "SEATS" THE TIRE FIRMLY ONTO THE WHEEL 

WHAT IS A BEAD

300

MUCH LIKE A WAFFLE IRON THE CURING PRESS USES THESE TO CREATE THE TREAD DESIGN AND ALLOW THE TIRE TO HARDEN ONCE COOLED.

WHAT IS A MOLD
400

IT IS KNOWN AS THE PROCESS OF CYCLING OUT OF ONE RECIPE OR TIRE, TO ANOTHER AND CAN BE COMPLETED IN 20 MINUTES TO A FEW HOURS. 

WHAT IS A CHANGEOVER

400

THE DEPARTMENT THAT CREATES ALL THE COMPONENTS FOR TIRE BUILDING AT SRUSA

WHAT IS STOCK OR COMPONENT PREP 

400

THIS 4TH STAGE IN THE TIRE MANUFACTURING PROCESS USES THIS ACTION TO GIVE COMPONENTS PROPER LENGTH, WIDTH AND ANGLES

WHAT IS CUTTING

400

THIS COLORFUL NAME IS USED FOR A NEWLY BUILT TIRE BEFORE IT HEADS TO CURING 

WHAT IS A GREEN TIRE

400

FINAL FINISHING REQUIRES ALL FINISHING MACHINES TO BE CALIBRATED CORRECTLY & SET UP TO PROPER SPECIFICATIONS TO ACHIEVE THIS MOST IMPORTANT QUALITY CONTROL STANDARD 

WHAT IS UNIFORMITY

500

THE FIRST STAGE OF TIRE BUILDING HAS TWO PROCESSES TO MIX RUBBER. 

WHAT IS BASE AND FINAL MIXING

500

TREADS, SIDEWALL AND BEAD FILLERS ARE CREATED THROUGH THIS PROCESS

WHAT IS EXTRUSION

500
OPERATORS MUST ALWAYS WEAR THIS "PPE" WHEN USING KNIVES OR CHANGING BLADES ON THEIR EQUIPMENT

WHAT ARE CUT RESISTANT GLOVES

500

ONE PERSON CAN CONTRIBUTE GREATLY IN REDUCING SCRAP BY KNOWING THIS "BACK TO BASICS" RULE

WHAT IS "CUT TO THE DEFECT"

500

THE EIGHTH STAGE OF TIRE BUILDING AND THE FINAL STEP BEFORE INSPECTION AND ITS OFF TO THE WAREHOUSE TO GET ON THE ROAD

WHAT IS FINISHING