Generators
Fire Alarm
Bad Installs & Fire Hazards
Theme Parks
ATS's
100

Name the NFPA code number for Emergency and Standby Power Systems

110

100

What NFPA code number is the National Fire Alarm and Signaling Code?

72

100

What is the code violation in this photo?

Can't run extension cord in wall (cord not rated for that use).

100

How many theme & Water parks does Disney and Universal have in Florida? 

10 (Magic Kindgom, EPCOT, Hollywood Studios, Animal Kindgom, Blizzard Beach, Typhoon Lagoon, Universal Studios, Islands of Adventure, Epic Universe, Volcano Bay)

100

What does it mean if an ATS is "4-pole"?

It means the neutral is also switched.
200

Should a generator be grounded as a separately derived system when using 4-pole ATS’s?

Yes

200
If you have only one smoke detector in a building, where would you install it?
within 5' of the fire alarm control panel
200

Name at least one code issue with this bad install

Ground Screw bonds to plastic enclosure. Netural is on ground terminal.

200

What is Bond's favorite Theme Park?

Universal Studios - Best vibes and best annual event - HHN

200

Can the life safety ATS be in the same room as the service entrance gear? Can the optional standby ATS be in the same room as the service entrance gear?

Nope; Yes

300

Does a generator require ground fault protection?

No but ground fault alarm is preferred

300

What does Class "A" and Class "B" mean?

Refers to how FA devices are wired: Class "A" means a FA "circuit" loops back to the panel (more $$$) - if a wire is cut, all devices still have functionaility; Class "B" is a straight line & does not loop around, if a line is cut, the devices after the cut will not be functional.

300

What is wrong on this install?

They attached the "grounded" wire to the ground. They have 2-wire system with not EGC. The proper code way to do this is to make them GFCI's.

300

What does EPCOT Stand for?

Experimental Prototype Community of Tomorrow

300

What two companies do we allow for ATS's

ASCO/Schneider Electric and RussElectric/Siemens


400

Can Storm piping (including roof drains) be located within the generator room?

Nope. Only items directly serving the room are permitted.

400

In Florida, how far from the end of a patient corridor is a fire alarm notification device required in a private mode system?

It's not required in patient corridor for private mode. 

400

Name at least one thing wrong in this bad install

Multiple wires underneath lugs (can't do that ever unless its specifically rated for that)

Trying to split the load between two breakers (can't do.

Wires "jumper" colors don't match the incoming wires -- can't use white for phase conductor (white is reserved for neutrals)

400

Name all 6 "universes" at EPIC Universe

Super Nintendo World, How to Train your Dragon - Isle of Berk, Wizarding World of Harry Potter in Paris/Ministry of Magic, Celestial Park, and Dark Universe

400

Panelboards have AIC ratings, what is the ATS equivalent?

WSR (Withstand Rating)

500

What is the minimum amount of fuel required for a hospital generator in Florida (in hours of run time at 100%)?

FBC  449.4.2.9.2 

The emergency power system shall be fueled by a fuel supply stored on-site sized to fuel the generator for 100-percent load for 64 hours or for 72 hours of actual demand load of the occupied patient area(s) and patient support area(s) and patient support utilities during and immediately following a disaster, whichever is greater.

500
In a fully sprinklered hospital, are smoke detectors required throughout corridors? What about equipment alcoves open to the corridor?
No and yes
500

Name at least two things wrong

NM/Romex cables have no clamp on panel entry

Multiple conductors under the panel main neutral lug

Hot conductor Under panel main hot lug

Fourth Feeder wire is not capped off appropriately.


500

What is this character's name?

Earl the Squirrel

500

What are the three transition types of ATS's?

Open Transition
Closed Transition
Dealyed Transition