Abbreviations
Definitions
LT Iron Phase
100

DS

Driving system

100

What is TPM?

TPM is a Heineken continuous improvement program. 

100

What two types of exist?

Mandatory and Secondary

200

MCRS

Management Control Reporting System

200

What is to E2E?

E2E is an agreed roadmap that ties strategy from senior management to shop floor level and vice versa

200

What are the two core pillars in Iron Phase for Breweries <500kHL

AM Pillar and WT Pillar

300

COE

Center of Excellence

300

What is a KPI?

A KPI is a measure of performance which helps manage processes

300

What is the expected % of Pillar Implementation and results for iron phase? (Pillar Maturity)

90x90

400

FTE

Full Time Employee

400

What is MoSF?

MoSF is pillar leaders active presence and involvement daily at the shop floor. 
400

% of Manu Star KPIs for Iron Phase?

>80%

500

SCDS

Supply Chain Driving System

500

What does a competency matrix map?

A competency matrix maps people development to skills, knowledge and behaviour requirements. 

500

List at least 3 steps in the LT Pillar Route

E2E Opp. assessment, setting direction, driving performance, leading change, shop floor excellence, build the desired culture