e-mobility
Maintenance
SCM
Engineering
Tech Rec / Planning
100

What is the virtual network called that is required to be turned on in order to connect to the e-mobility apps?

VPN 

100

*** WILDCARD *** 100 Points in the back for you!!!!

*** WILDCARD *** 100 Points in the back for you!!!!

100

Name two PN Categories that are SERIALIZED in HA

ROT, TOOLCAP, LLEXP, and others

100

What is the unscheduled equivalent of a Task Card?

Non Routine

100

an open log page on an airplane cannot be cleared. How can mechanics/MOC determine if they can defer it?

Must be allowed according to MEL/CDL/GMM

200

In Task Control, what are the three options to discontinue work on a task card item?

Pause, Stop, Complete

200

What's the difference between work orders and defects?

work orders are for scheduled work, defects are for unscheduled work

200

What does it mean when a part is in status 'Pending Inventory'?

Part has been removed from AC and is waiting for RTS

200

What window can open/pending TC Revisions be viewed in?

Task Card Authorization Management

200

A mechanic ordered parts for a defect from Quickturn, but instead of a picklist, he received a Requisition. What's the reason?

No parts available at the location he is requesting from

300

What characteristic do Trax location-sites need to be displayed in Task Control?

They have to be flagged as 'Long Term Visit' sites

300

What are the different statuses a WO goes through in its lifecycle?

(Generation) - Open - Completed - Post Completed - Closed

300

*** WILDCARD *** 300 points in the bank for you!!!

*** WILDCARD *** 300 points in the bank for you!!!

300

what does the 'EOM' checkbox in the engineering schedule screen do?

EOM = end of month, pushes the due date of the EC to the last day of the due month

300

An EC has a schedule of:
1000 FH, 500 Cycles, 180 Days.

Which of these will Trax use to calculate a due date?

All three, and display the one coming due the soonest

400
What needs to be set up in order for locations to show up for a user in Quickturn?

Location needs to be linked to mechanic in Line Control

400

What window is used to record oil uplifts in Trax?

A/C Units

400

What needs to be set up for picklists that are generated from HNLMX to print in Supply?

Picklist Location Routing

400
an EC is due every 500 flight hours (schedule set correctly)

Effectivity is set for N480HA
The current flight hours since reset for N480HA are 480.
However, the EC is not showing up as due for this AC - give a reason why this may be?

Missing Plan/Average hours for forecasting

400

*** WILDCARD *** - 400 points in the back for you!!!

*** WILDCARD *** - 400 points in the back for you!!!

500

in QT, what's the difference between 'Part List Requirement' and 'Picklist"?

Part list requirement is a list of parts required to do the work.

Picklist reserves parts

500

What flag needs to be checked on a WO so it allows entry of an AC that is NOT part of the Trax fleet

TPW checkbox must be checked

500

What order of windows/functions is followed for Physical Inventory counts in Trax?

PI Generation - PI Count - PI Recount (optional) - PI Adjustment

500

An AC was on a WO, and the WO was closed and the EC was performed (all TCs closed). However, no compliance was written for this EC. What is the reason?

EC was set to 'Do Not Reset' on the WO

500

An assembly was removed from the AC using the Inventory Supervisor.
This caused the problem of the sub-assmbly parts not being removed.
How can this be fixed?

're-install' the NHA back unto the AC (backdated tpo original date), then use AC PN Transaction to remove the entire assembly