People
Ch-ch-ch-changes!
Notable Numbers
Quality Time
Technically Savvy
100

This person is known as "The Draft King," "The Godfather of ACADE," and many more names, but only one given at birth.

Who is Chris Gatlin?

100

This transformer changed its make and model multiple times throughout design, including the most recent change only weeks before IFC.

What is Transformer 3?

100

EU00584401

What is the General Arrangement Drawing Number?

100

A P&C input that shows up on every relay drawing, inconsistently spelled in PPL standards as either one word or two words.

What is Crosstrigger? (one word!!!)

100

This pilot scheme could not be used on the Spring Mountain customer lines due to the extremely short line length.

What is POTT?

200

The original PPL development PM for the project

Who is Sean Zagwoski?

200

A broken IPP scheme infamous to PPL engineers that BMcD has offered to expand scope and redesign.

What is PA Solar?

200

The number of relay panel rows at ultimate buildout

What is 38?

200

This quality comment on the control cubicle bid package prompted major discussions with PPL Structural, affecting foundation design.

What is snow loading?

200

The minimum level of illumination required by PPL Standard at the substation fenceline.

What is 0.2 foot-candles?

300

The PPL LRE for the project

Who is Muhammad Anwar?

300

The total number of change orders according to the Chg_Mgmt DFS folders

What is 11?

300

The total number of circuit breakers in the substation according to IFC

What is 43?

300

The QC-only resource that spent the most hours on Tresckow.

Who is Kathy Hunter?

300

The only 230kV transmission line leaving Tresckow that requires a dual-DTT scheme due to a line-tapped transformer at the remote end.

What is East Palmerton?

400

The employee owner that spent the most hours on Tresckow

Who is Doug Reitmeyer? (over Josh by only 13 hours!)

400

A 90% challenge session comment that caused revisions to over 500 drawings.

What is the 2nd SCADA panel request?

400

The total number of distribution substations in Tresckow's remote end scope

What is 10?

400

Q4 reviewer of the AMS Point Assignment Sheet

Who is Erin Koczur?

400

A specialized type of grounding occasionally needed on substation capacitor banks as an alternative to direct neutral grounding, determined as not recommended for Tresckow.

What is peninsula grounding?

500

The co-op with the most hours on Tresckow

Who is Colin Cover?

500

The initial buildout of Tresckow according to Gate 0, Rev. 0

What is a four bay BAAH 230kV Switchyard?

500

The Thermal Rating Factor (TRF) of the metering CTs on Tresckow's 230kV circuit breakers.

What is 4?

500

The number of QTS forms submitted for Tresckow (within 10)

What is 120?

500

In rigid bus design, when increasing conductor phase spacing, the magnitude of this force decreases.

What is Short Circuit Load/Force?